Laserfiche WebLink
New Horizon Mine <br /> Lester Goforth <br /> December 10,2018 <br /> Page 2 of 2 <br /> State of Colorado should the dam fail for any reason. Please be aware that it is in the <br /> owner's best interest to construct, operate, and maintain the structure in a safe manner, as <br /> he or she may be held liable in civil court for any downstream damages resulting from failure <br /> of the dam. A copy of Specifications for Construction of Non-Jurisdictional Dams is provided <br /> to assist you in the construction of a sound structure. <br /> Finally, please be aware of any other permitting or regulatory requirements associated with <br /> the construction of a water impoundment structure, including but not limited to county <br /> and/or municipal regulations, and wetland permitting through the U.S. Army Corps of <br /> Engineers (see for www.usace.army.mi I for regional contact information). <br /> Please contact Water Commissioner,Mark Ragsdale, (970)975-0051 or <br /> mark.ragsdaleCstate.co.us prior to beginning construction on this project; and again when <br /> construction is complete. Feel free to direct any dam safety related questions to the local <br /> Dam Safety Engineer, Jason Ward at (970) 249-6622 ext.4105 or jason.ward@state.co.us. <br /> Sincerely, <br /> Bob W. Hurford, P.E. <br /> Division Engineer <br /> Enclosures: Signed Notice of Intent to Construct a Non-Jurisdictional Water <br /> Impoundment Structure <br /> Specifications for Construction of Non-Jurisdictional Dams <br /> P.O.Box 456(2730 Commercial Way),Montrose,CO 81402 P 970.249,6622 F 970.249.8728 www.water.state.co.us <br />