Laserfiche WebLink
<br /> <br />Public Notice <br /> <br /> <br />The Division of Reclamation, Mining and Safety, in accordance with Title 34, Article 33, of the Colorado <br />Revised Statutes, hereby issues notice that on January 26, 2021, a minor revision application (MR-126) to <br />the New Elk Mine, Permit No. C-1981-012, operated by New Elk Coal Company, LLC, 12250 Highway <br />12, Weston, CO 81091 was considered complete for the purposes of filing. MR-126 revises TR-75 which <br />added drill hole locations to the PAP. MR-126 is a revision to move the location of one hole for ease of <br />access. The applicant is not proposing additional surface disturbance outside of the area currently <br />approved for disturbance. All reviews and comment periods as provided in the Act and Regulations <br />promulgated thereunder initiate from this date of filing. The revision application, as well as all other <br />permit documents, can be viewed at https://dnrweblink.state.co.us/drms/search.aspx by searching <br />C1981012 in the “Permit No” field. A user guide is available to help first time users of the imaged <br />document system and can be viewed at https://drive.google.com/file/d/1l8OUdf_Mpjo3kxIHkP5hMH- <br />w7MeBtxX7/view. <br /> <br /> <br /> Posted January 26, 2021 <br /> <br /> C-MR-03