Laserfiche WebLink
EXHIBIT E <br /> Reclamation Plan <br /> Reclamation of the mining site will be reclaimed for rangeland use. <br /> The existing overburden from the mine site will be placed in a manner to <br /> leave all slopes at 4:1 or flatter. After the slopes have been established <br /> existing topsoil for the mine site will be respread over the mine site at a <br /> depth of 2" to 6". The site will be seeded with a mix that resembles the <br /> surrounding native grasses. The use of fertilizers is not anticipated at this <br /> time. No trees or shrubs were present prior to mining, no trees or shrubs will <br /> be planted as part of the reclamation. The reclamation of the runoff on the <br /> north east side of the pit will consist of using equipment to remove sediment <br /> deposits 1" thick or greater and return the sediment to the mining site. All <br /> disturbed areas will be seeded with a mix that resembles the surrounding <br /> native seed. The use of fertilizers is not anticipated at this time. <br />