Laserfiche WebLink
STATE OF COLORADO <br /> DIVISION OF RECLAMATION MINING AND SAFETY <br /> Department of Natural Resource RECEIVED <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 COLORADO <br /> A�F DIVISION OF <br /> Phone:(303)866-3567 ���1 RECLANLATION <br /> Jul 25 FAX:(303)832-8106 MINING <br /> DNISION OF RECLAMA71 ION SAFETY <br /> MINING AND SAFETY <br /> CONSTRUCTION MATERIALS <br /> REGULAR(112)OPERATION <br /> RECLAMATION PERMIT APPLICATION FORM <br /> CHECK ONE:n There is a File Number Already Assigned to this Operation <br /> Permit# M2�019 Qoa (Please reference the file number currently assigned to this operation) <br /> New Application(Rule 1A.5) Amendment Application(Rule 1.10) <br /> Conversion Application(Rule 1.1 1) <br /> Permit# M 2-019 Q02 - (provide for Amendments and Conversions of existing permits) <br /> The application for a Construction Materials Regular 112 Operation Reclamation Permit contains three major parts: (1)the application <br /> form;(2)Exhibits A-S,Addendum 1,any sections of Exhibit 6.5(Geotechnical Stability Exhibit,and(3)the application fee. When you <br /> submit your application, be sure to include one (1) complete signed and notarized ORIGINAL and one (1) copy of the completed <br /> application form,two(2)copies of Exhibits A-S,Addendum 1,appropriate sections of 6.5(Geoteclmical Stability Exhibit,and a check for <br /> the application fee described under Section(4)below. Exhibits should NOT be bound or in a 3-ring binder,maps should be folded to <br /> 8 112" X 1 I"or 8 112"X 14"size. To expedite processing,please provide the information in the format and order described in this form. <br /> GENERAL OPERATION INFORMATION <br /> Type or print clearly,in the space provided, ALI,information requested below. <br /> 1. Applicant/operator or company name(name to he used on permit): CASTLE ROCK CONSTRUCTION COMPANY OF COLORADO,LLC <br /> 1.1 Type of organization(corporation,partnership,etc.): PARTNERSHIP <br /> 2. Operation name(pit,mine or site name): STRODE PIT <br /> 3. Permitted acreage(new or existine site): 29.93 permitted acres <br /> 3.1 Change in acreage(+) A7 acres <br /> 3.2 Total acreage in Permit area 30.4 acres <br /> 4. Fees: <br /> 4.1 New Application $2,696.00 application fee <br /> 4.2 New Quarry Application $3342.00 quarry application <br /> 4.4 Amendment Fee $2,229.00 amendment fee <br /> 4.5 Conversion to 112 operation(set by statute) $2,696.00 conversion fee <br /> S. Prirnary commodities to be mined: SAND <br /> 5.1 Incidental commoditic(s)to be mined: 1, - lbs/Tonslyr 2. 1 lbslTonslYr <br /> 3. ! lbs/Tonslvr 4._ 1 lbs/TonsJvr 5. 1 IbsrTonslvr <br /> 5.2 Anticipated end use of primary commodities)to be mined: October 2020 <br /> 5.3 Anticipated end use of incidental commoditie(s)to be mined: October 2020 <br />