Laserfiche WebLink
Ms. Ioana Comaniciu, P.E. <br /> June 22,2015 <br /> Page 4 <br /> Water Balance <br /> In order to meet the criteria outlined in the guidelines for a lined reservoir, the leak test must <br /> demonstrate that the steady state condition for design or performance standard is: <br /> Qdesign= 53.0 gpm>Qpump+Qevaporation- Qprecipitation <br /> Qperformance= 159.0 gpm>Qpump+Qevaporation- Qprecipitation <br /> i <br /> The required facilities and measuring equipment will be in-place and operational prior to the start <br /> of the leak test. If you would like to see the leak testing procedure please contact me and we will <br /> schedule a time to meet on-site. <br /> Please call with your availability for and a site meeting and if you have any questions or <br /> comments. <br /> Sincerely, I <br /> I <br /> DEERE&AULT CONSULTANTS, INC. <br /> I <br /> Derek H.Foster,P.E. <br /> Project Engineer <br /> Attachments <br /> cc: Ben Frei <br /> Qa0247 Albert Frei&SonAO247.011 Stagecoach Leak Test%eak TeuX30 Day 2015\4tagemwit 30 Day Leak Test Plan Itr.doc t <br /> i <br /> i <br /> I <br /> E <br /> i <br /> i <br /> t� <br /> i <br />