My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-21_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2021-01-21_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 6:00:29 PM
Creation date
1/25/2021 10:15:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
1/21/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Moffat County Mining, LLC
Type & Sequence
SL5
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parcel 49 <br />6109 <br />—" 6097 <br />° 6087 101.7 <br />a) 6087.6 <br />w 6083. <br />Point of Interest <br />f Elev Measured (Ft) f Map Elev (Ft) <br />Drainage Reconstruction <br />Each of the SL5 bond release parcels exhibits positive drainage. Runoff from each parcel flows into <br />ditches and then to sedimentation ponds prior to water discharging from the site. Post mine drainage <br />channels are designed to control runoff and erosion. All channels are designed to control the 10 year 24 <br />hour flood event. One drainage (parcel 25), pond drainage areas and one ditch were included within the <br />bond release block as per the SL5 Phase I Bond Release Map submitted with the application. The channel <br />in parcel 25 reports to the 9-P2 and 9-P3 ponds in parcel 26. Slope and aspect are consistent with the <br />reclamation plan. Pond areas drainage ditches and channels were functional, stable and no problems were <br />noted at the time of the inspection. The lining in the mine water ditch was intact and the gradient and <br />size of the drainages met the design requirements of the permit. <br />Summary and Conclusions <br />Based upon a review of the mine permit, the applicant's bond release application, and site inspections, <br />the Division finds that Moffat County Mining, LLC has completed backfilling, grading and drainage <br />reestablishment at the Williams Fork Mines in accordance with the approved reclamation plan. <br />IV. PROPOSED DECISION <br />Based on the observations above, the Division proposes to approve Moffat County Mining, LLC's <br />request for a partial Phase I bond release for the Williams Fork Mines. This proposed decision will <br />release the applicant from liability for backfilling, grading, and drainage reestablishment (Phase I) as per <br />Rule 3.03.1(3)(b) for the 176.7 acres requested as per Map SL5 Phase I Bond Release as submitted with <br />the application package. <br />PHASE I <br />The Division holds a performance bond of $4,691,000.00 for the Williams Fork Mine. The current <br />liability for the site is $4,678,879.02. The total applicable bond for the 176.7 acre Phase I area is <br />$1,450,452.50: [(original performance bond/original acres of disturbance) * requested Phase I acres]. <br />$870,271.50 constitutes 60% of the amount releasable for Phase I reclamation of 176.7 acres. The <br />remaining $3,808,607.52 is sufficient to assure completion of the remaining reclamation work at the site <br />Permit Number. C1981044 Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.