My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-14_REVISION - M1977300 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2021-01-14_REVISION - M1977300 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:53:51 AM
Creation date
1/19/2021 7:21:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
1/14/2021
Doc Name
Adequacy Review Response #3
From
Colorado Legacy Land
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADo LEGACY LAND <br /> SCHWARTZWALDER MINE <br /> TABLE L-1.SCHWARTZWALDER MINE <br /> Source Amount Description Notes <br /> Kessler quote per TR-23,includes topsoil <br /> $88,389 Waste Rock Pile Cap seed and mulch <br /> $1,470,327 Subtotal(Direct Costs) <br /> Alluvial Fill(DRMS Indirect Costsl <br /> $29,701 Liability Insurance 2.02%of Direct Costs <br /> $15,438 Performance Bond 1.05%of Direct Costs <br /> $23,565 Job superintendent 322.59 hrs @$65.41 <br /> $147,033 Profit 10%of Direct Costs <br /> $215,737 Subtotal(Indirect Costs) <br /> Alluvial Fill(Eng/Managementl <br /> Engineering Word&/or Contract/Bid <br /> $71,658 Prep 4.25%of Direct and Indirect Costs <br /> $84,303 Reclamation management&/or Admin. 5%of Direct and Indirect Costs <br /> $155,961 Subtotal(Eng/Management) <br /> Other $1,187,529 Denver Water, Water Treatment(Contingent cost) <br /> Total <br /> Bond $8,900,000 <br /> Reclamation costs for the North Waste Rock Pile Upland Area and Former Black Forest Mine are presented in <br /> Table L-2. The surface expression of both proposed areas is unimpacted. Therefor no grading,topsoiling,or <br /> revegetation for these areas are required. Costs in Table L-2 are specifically for the backfilling of the main <br /> portal and escape portal of the Black Forest Mine. These costs are provided as a basis of estimate only. <br /> However, it is not recommended that the full bond listed in Table L-1 be amended due to ongoing surety <br /> evaluations and bond reductions for completed reclamation work. <br /> Item Unit Cost Quantity Total Cost Notes/Basis of Estimate <br /> Backfill Materials <br /> Fill Soil $8.00/CY 60 CY $480.00 Sufficient quantities of fill soil have been identified <br /> during the alluvial valley excavation work. This soil <br /> shall be used to close the main and escape portals of <br /> the Black Forest Mine. The haul/push distance for <br /> this material is estimated to be less than 1,000 feet. <br /> Top Soil/Plant $14.50/CY 161 CY $145.00 Sufficient quantities of top soil have been identified <br /> Growth during the alluvial valley excavation work. This soil <br /> Medium shall be used to close the main and escape portals of <br /> the Black Forest Mine. The haul/push distance for <br /> this material is estimated to be less than 1,000 feet. <br /> JANUARY 2021 59 AMENDMENT 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.