Laserfiche WebLink
r ,,COLORADo LEGACY LAND <br /> SCHWARTZWALDER MINE <br /> impacted soils will need to be excavated. The capacity of the CV Glory Hole was estimated in Technical Revision <br /> 14 to be approximately 56,000 CY. However,as of January 2020,the CV Glory Hole is approximately 50%full, <br /> with an estimated 28,000 CY of capacity remaining. In order to accommodate the additional volume of <br /> excavated materials,this amendment expands the affected permit area to include the former Black Forest Mine. <br /> The former Black Forest Mine is a dry underground aggregate mine wholly owned by Colorado Legacy Land, <br /> LLC (CLL) and within CLL's property boundary. It has an estimated capacity of 15,000 CY. The former Black <br /> Forest Mine permit(Permit No.M-2001-036)was formally closed in 2019. In accordance with Colorado Hard <br /> Rock Mining Rule 6.4.21.(19),CLL proposes disposing of excavated materials from the alluvial valley in either <br /> the former Black Forest Mine or the CV Glory Hole of the Schwartzwalder Mine. Technical Revision 14 <br /> documents the de minimums impact of alluvial soils disposed of in the CV Glory Hole. The former Black Forest <br /> Mine is a dry mine and is not connected to the adjacent Schwartzwalder mine workings. Dry mines do not have <br /> the opportunity to contact surface water or groundwater,therefore the impacts to water quality onsite are de <br /> minimis. Furthermore, as stated in Technical Revision 14, "...waste rock within the alluvial fill has <br /> demonstrated no propensity to acidify groundwater. This is based on sampling of several small seeps and the <br /> fact that pH of deep bedrock groundwater in the vicinity of the CV Glory Hole is approximately neutral or <br /> slightly basic." The Floor of the main entrance and escape portal for the Black Forest Mine are included in the <br /> current Schwartzwalder Mine affected area boundary. These entrances are currently closed with gates. Once <br /> alluvial valley excavation and disposal in the Black Forest is complete,the gates shall be removed,and the main <br /> entrance and escape portal gates shall be backfilled with rockfill for aesthetic purposes: <br /> • Adit Backfilling-Rockfill: Prior to backfilling adits,all wood,garbage,cribbing,or other vegetative <br /> materials shall be removed. Adits shall be backfilled to a minimum depth of fifteen feet(15')from the <br /> inner top of the fill to the outer top of the fill. There shall be no spaces between the top of the fill and <br /> the roof of the adit that exceed three inches(K)and there shall be no space between the top of the fill <br /> and the roof of the adit at the entrance of the adit. The innermost three feet(3') of the backfill shall <br /> consist entirely of large diameter rock (>V) sourced from onsite. The remainder of the fill with the <br /> exception of the outermost one foot(V)shall consist of Rockfill mixed with Common Fill to minimize <br /> visible void space between the rocks. The outermost one foot(1') of backfill shall consist of suitable <br /> plant-growth medium. All slopes greater than 2H:1V shall be covered with a layer of hydromulch with <br /> tackifier to keep the seed mix (Table E-1) in place. Figure E-1 illustrates a typical an adit closure for <br /> this project. <br /> The adit backfilling closure specification(above)is summarized from the Colorado Inactive Mine Reclamation <br /> Program's General Bid Specifications (Division of Reclamation,Mining&Safety,March 2009). This backfilling <br /> shall be completed consistent with the surrounding topography (approximately 15-30% slopes,as shown in <br /> Figure F-1) for a more"natural looking"closure. During the alluvial valley excavation project,clean materials <br /> for rockfill closure (soil,and rock) have been identified and set aside during excavation work. These native, <br /> clean materials shall be used to backfill the entrance and escape portal to the Black Forest Mine. <br /> Seed mix and hydromulch with tackifier shall be purchased from a third-party vendor and brought to the site. <br /> The specific volume of materials, haul distances, and equipment needed to complete the adit closures are <br /> presented in Exhibit L along with the associated costs. Backfilling shall be conducted along with the alluvial <br /> valley restoration and regrading once excavation work is complete. It is anticipated that this work will be <br /> completed in the 2021 calendar year. <br /> JANUARY 2021 15 AMENDMENT 5 <br />