Laserfiche WebLink
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: brr, Y AoA and completion: DRx,.1 A Ja0 <br /> 2) Depth of topsoil to be salvaged (check one): <br /> F 4-6 inches n6-8 inches <br /> r 8-10 inches _[]L10-12 inches <br /> _13_Other: <br /> _jZ _N/A, explain:Ala+ tdlauah �\ *a \J c,:-U&S A j 12& e Cy <br /> 3) Description of how topsoil will be stockpiled and stabilized: <br /> 4) Thickness of overburden needed to be moved: feet or-X N/A <br /> 5) Thickness of deposit to be mined: feet <br /> 6) How will the mine be accessed: CO) existing roads new roads will be created <br /> a. Please describe the existing roads: <br /> nftae' AnMN- o rLr6,t Canch Aaa s eurL L16' ty%bai <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements (note, new roads must be included in permitted acreage): <br /> 7) Will water be needed during the mining operation(check one): (J�U Yes or tut No <br /> a. If yes,please describe the source of the water and how much water will be used during the <br /> operation: <br /> Wa, :C r- W I`N by US,s . cOr r 054- C n�r-61. WCAC"g- <br /> L M W rocJ i ,sr- <br />