My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-14_PERMIT FILE - M2020055
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020055
>
2021-01-14_PERMIT FILE - M2020055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:12:47 AM
Creation date
1/19/2021 7:03:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020055
IBM Index Class Name
PERMIT FILE
Doc Date
1/14/2021
Doc Name
Response to Deficiencies
From
Snare Construction, Inc.
To
DRMS
Email Name
ERR
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: brr, Y AoA and completion: DRx,.1 A Ja0 <br /> 2) Depth of topsoil to be salvaged (check one): <br /> F 4-6 inches n6-8 inches <br /> r 8-10 inches _[]L10-12 inches <br /> _13_Other: <br /> _jZ _N/A, explain:Ala+ tdlauah �\ *a \J c,:-U&S A j 12& e Cy <br /> 3) Description of how topsoil will be stockpiled and stabilized: <br /> 4) Thickness of overburden needed to be moved: feet or-X N/A <br /> 5) Thickness of deposit to be mined: feet <br /> 6) How will the mine be accessed: CO) existing roads new roads will be created <br /> a. Please describe the existing roads: <br /> nftae' AnMN- o rLr6,t Canch Aaa s eurL L16' ty%bai <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements (note, new roads must be included in permitted acreage): <br /> 7) Will water be needed during the mining operation(check one): (J�U Yes or tut No <br /> a. If yes,please describe the source of the water and how much water will be used during the <br /> operation: <br /> Wa, :C r- W I`N by US,s . cOr r 054- C n�r-61. WCAC"g- <br /> L M W rocJ i ,sr- <br />
The URL can be used to link to this page
Your browser does not support the video tag.