My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-23_PERMIT FILE - C1981044 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981044
>
2020-12-23_PERMIT FILE - C1981044 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:11:09 AM
Creation date
1/14/2021 5:52:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
12/23/2020
Section_Exhibit Name
Exhibit 18B Permanent Pond Demonstrations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Emergency Spillway (See Table 1, Spillway Sizing Guidelines) <br /> Bottom Width (ft) Side Slopes: Freeboard (ft)' Location relative to embankment (facing <br /> (Horizontal : 1 Vertical) downstream) <br /> 0 2: �2.0 C)Left (�)Right C)No Spillway <br /> Freeboard means the vertical dimension between the crest (or invert)of the emergency spillway and the crest of the dam,the <br /> minimum is 3 feet. <br /> 9. Outlet Conduit <br /> Material Type Metal Pipe <br /> Diameter (inches) <br /> 611 <br /> For Livestock Water Tanks <br /> Can all water be drained through a gated or ungated outlet?0 Yes No <br /> For Erosion Control Dams <br /> Can water be drained through an ungated outlet leaving no more than 2 acre-feet in storage? Yes No <br /> 10. Dam Status <br /> Proposed <br /> Existing' If existing, when was construction completed? 1979 <br /> 'These dams may be subject to modification, alteration, repair, or breach consistent with the authority of the State <br /> Engineer. <br /> 11 . Sign and Enter Name of Responsible Individual or Authorized Agent <br /> • Construction must reasonably comply with the attached standard plans and specifications and the claims made in this <br /> application. Dam designs completed by a Professional Engineer and submitted with the application may be accepted as <br /> an alternative to the standards. If the State Engineer finds that the construction fails to conform with the application <br /> and standards, it is the duty of the owner to make changes the State Engineer determines are necessary. <br /> • The making of false statements herein constitutes perjury in the second degree, which is punishable as a class 1 <br /> misdemeanor pursuant to C.R.S. 24-4-104 (13)(a). I have read the statements herein, know the contents thereof and <br /> state that they are true to my knowledge. <br /> Sign or Enter Name(s) of Responsible Individual(s) or Authorized Agent Date <br /> 08/05/2020 <br /> If Signing Enter Name and Title <br /> Miranda Kawcak, Environmental Manager <br /> DRS-11:Application for Livestock Water Tank and Erosion Control Dam- Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.