Laserfiche WebLink
Code Enforcement Evaluation dated October 1, 2019). Town Staff has requested that <br /> Aggregate Industries provide confirmation that lighting was/is installed and to provide <br /> documentation that the lights are downcast and photovoltaically controlled or <br /> documentation that CDOT denied access to install such lighting. The Town concurs with <br /> Aggregate Industries'statement that the site lighting is not in conformance with the lighting <br /> standards as set forth in the PUD. This non-conformity must be remedied. <br /> 19. Shielded/Downcast Lighting V.B-Any new lighting shall be shielded and downcast and <br /> designed so as to not cast direct light or glare outside the mining and processing areas. <br /> Lighting shall not exceed 70 feet in height from the bottom of the quarry floor for either the <br /> concrete or asphalt plants. <br /> Compliance Status: A site inspection is required to confirm, but at this time,the Town <br /> concurs with Aggregate Industries' statement that the lighting structures are above 70 feet <br /> in height and not in compliance with the lighting standards as set forth in the governing <br /> PUD.This non-conformity must be remedied. <br /> 20. Industry Standard Lighting Requirement V.0-Lighting of structures shall be allowed in <br /> accordance with industry standards and requirements. <br /> Compliance Status: Based on recent lighting complaints, Staff suspects the existing <br /> structures are lit beyond industry standards and requirements. Data related to industry <br /> standards and requirements, and a site inspection are required to evaluate compliance. If <br /> the lighting is not compliant,this non-conformity must be remedied. <br /> 21. Free standing Pole Standards V.D- Free standing pole lights shall not exceed 20 feet in <br /> height and shall be downcast halogen lights. <br /> Compliance Status: Although a site inspection is required to confirm,the applicant has <br /> verbally stated that existing free standing light poles greatly exceed 20 feet on site. Please <br /> submit documentation of free standing pole light heights and light shielding. If they do not <br /> conform to the PUD requirements,this non-conformity must be remedied. <br /> VI. SECURITY FENCING <br /> 22. The entire area of the Morrison quarry is presently and shall continue to be surrounded by a <br /> security fence made up of four strands of barbed wire shown by the mining plan <br /> accompanying the Operator's application to the Colorado Division of Mineral and Geology. <br /> This fence shall be maintained by the Operator. <br /> Compliance Status:A site visit is required to confirm compliance. <br /> VII. ASPHALT AND CONCRETE PLANTS <br /> 23. Air Quality Control Permit VILA-The Morrison Quarry State Air Quality Control Permit shall <br /> be amended,as required by the Colorado Department of Health to show the addition of <br /> Page 6 of 9 <br />