Laserfiche WebLink
The 'Mineral Conservation Area' is currently intended to remain vacant and undeveloped for <br /> purposes of conserving commercial mineral deposits which may exist in the'Mineral <br /> Conservation Area', as contemplated by Colorado Revised Statutes 34-1-301,et seq." <br /> Compliance Status: More information is needed to determine compliance. Is mining in the <br /> Mining Conservation Area currently proposed? Please provide detailed information on <br /> Construction Materials Reclamation Permit Amendment application including the scope, <br /> scale, schedule, and future haul road, etc. <br /> 4. Permitted Building and Structures I.L.1—"Sale Office" and "Scale house" have been added <br /> to the list of permitted building and structures but are not currently allowed. <br /> Compliance Status: More information is needed to determine compliance. Please confirm <br /> if there is a scale house or sale office on site. Are these names references to the same <br /> building? Please confirm whether a scale house and/or sale office currently exists on the <br /> property. If not, an amendment to the 1998 PUD is required. <br /> 5. Permitted Structures I.L.2—"Truck Wash" has been added to the list of permitted structures <br /> in the rescinded PUD Amendment but is not included in the 1998 PUD. <br /> Compliance Status: More information is needed to determine compliance. Please confirm <br /> if there is a truck wash on site. If a truck wash exists on site, please so state. If not, an <br /> amendment to the 1998 PUD is required. <br /> 6. Building Square Footage I.L.3—Current PUD states the buildings in aggregate shall not <br /> exceed 10,000 square feet. <br /> Compliance Status: More information and site inspection are needed to determine <br /> compliance. Please provide documentation of all building square footages. If the buildings <br /> in aggregate exceed 10,000 square feet, a PUD amendment is required. <br /> 7. Maximum Building Height I1.4—The maximum height of buildings shall be 35 feet and the <br /> maximum structures shall be 90 feet. <br /> Compliance Status: More information and site inspection are needed to determine <br /> compliance. Please provide documentation of conformance with the maximum building <br /> height standards as set forth in the 1998 PUD. <br /> II. Traffic <br /> 8. Noise Level II.D.—Noise shall be monitored at the haul road and shall be recorded. Tapes <br /> documenting noise levels shall be kept on file for 12 months. Violations shall be logged by <br /> the Operator,and the logs shall be provided to the town within 3 business days after written <br /> request. <br /> Page 2 of 9 <br />