Laserfiche WebLink
L16 Thence 254.498 N 650 15' 13.12" E <br /> L17 Thence 126.268 S 410 46'28.81" E <br /> L18 Thence 48.527 S 18°59' 37.69"W <br /> L19 Thence 43.650 S 65°26'48.35" E <br /> L20 Thence 31.020 N 850 04'40.17" E <br /> L21 Thence 262.951 S 410 46'28.81" E <br /> L22 Thence 188.212 S 570 55'06.21"W <br /> L23 Thence 36.387 S 860 49'33.08"W <br /> L24 Thence 8.319 S 100 01'04.02"W <br /> L25 Thence 11.830 S 850 30'30.81" E <br /> L26 Thence 430.712 S 070 39'42.79" E <br /> L27 Thence 152.299 S 250 58'47.74" E <br /> Back to the Point of Beginning(POB) totaling approximately 9.60 acres. <br /> The average elevation of the mine site is 9,700' MSL. <br /> 2. Pit entry Coordinates: <br /> Entrance: Access is made off Boulder County Road 128 (Caribou Road) at two locations. <br /> UTM: Future access#1 N 4,425,947.4 meters, E 450,580.1 meters, Zone 13, NAD 83 <br /> Future access#1 N 4,425,190.2 meters, E 451,649.9 meters, Zone 13, NAD 83 <br /> (These are the approximate locations of the main entrances to the GIR mining operation). <br />