My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-29_INSPECTION - C1983059 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1983059
>
2020-12-29_INSPECTION - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2021 4:09:43 PM
Creation date
1/8/2021 8:25:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Inspection
Doc Date
12/29/2020
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
12/23/2020
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 23, 2020 C-1983-059/Terror Creek Loadout LDS <br /> 3. Non-coal waste (scrap metal)was visible on the embankment,to the west of the recently backfilled area. <br /> All non-coal waste should be removed from the site. <br /> An additional consideration is that,in order for final bond release to be approved over the entire site,it will be <br /> necessary that the entire site support the approved post-mining land use,as described in section 2.05.5 of the PAP <br /> (RV/boat storage). If the existing railroad siding does not support that land use it should be reclaimed. In order to <br /> assess this the Division will refer to the Delta County land use permit when considering a future bond release <br /> application,and specifically how the area covered by that permit compares with the boundary of the disturbance <br /> associated with the mining permit. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3;Redistribution 4.06.4: <br /> The topsoil stockpile was clearly identified with a signpost,and protected with straw wattles. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.