My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-22_PERMIT FILE - C1981012A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2020-10-22_PERMIT FILE - C1981012A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 11:17:55 AM
Creation date
1/7/2021 9:00:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
10/22/2020
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br />Pond 001 Emergency Spillway Design <br />Criteria: 25 Year, 24 hr. Storm Event =3.4 inches <br />Minimal run-off into pond <br />Peak Mine Water Flow into pond = 4,000 gpm=8.9 cfs <br />Spillway Capacity>Mine Water Inflow + 25 yr 24 hr Storm Event <br />For open channel flow <br />Q=Cm/N A, R2" S"a (modified Mannings equation) <br />Where: Q=Flow <br />Cm=Constant=1.49 (English units) <br />Al=area dedicated to mine water inflow <br />R=wetted perimeter <br />S=Channel Bottom Out slope <br />N=Mannings roughness factor --0.29 for gravel <br />AI = [8.6(48 +2(3.4)) + (8.6)(8.6)] / 144 A� = 3.79 Ft' <br />R = 3.79/ [48 + 6.8 + 2(2(8.6)1/2) / 12] R = 0.68 <br />Q = [(1.49) / 0.029] (3.79) (0.68)23 (0.1)12 Q = 35.1 cfs <br />Safety Factor = 35.1 cfs / 8.9 cfs SF = 3.9 <br />Additional discharges into Pond 007 will include sump discharge from the raw and <br />clean coal reclaim tunnel, and industrial building sump. These additional discharges <br />will be infrequent, of short duration and of relatively small magnitude. Total <br />estimated flow from these sources is 600 to 800 gpd. The surplus capacity in Pond <br />007 is more than adequate to handle the additional water volumes and sediment loads <br />generated by these sources. <br />Pond 006 will be placed in the New Elk preparation plant water -flow circuit as <br />shown on Figure 4. The plant will require 70.9 gpm of make-up water at a 400 ton <br />per hour feed rate. Pond 006 design is shown in Exhibit 19. Pond 006 will be a non - <br />discharging structure. The operator has amended the current NPDES permit to allow <br />for this. Installation of the Pond 006 emergency spillway is proposed to be completed <br />by January 1, 1989. The operator will also be utilizing pond 006 as a polishing pond <br />for the sewage treatment plant. <br />The operator submitted design specifications and received construction approval for <br />Section 2.05 RN -6 10/17/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.