Laserfiche WebLink
105 <br /> Table 27 Hydrologic Monitoring Frequency Requirements <br /> Site Water level or Field Laboratory NPDES List <br /> flow Measurements Analysis <br /> PRS-1 S S A <br /> PRS-1a ** Q Q Q <br /> PRS-4(aka NE080) S S A <br /> PRS-4a ** Q (then S) Q(then S) Q(then A) <br /> TH-201 Q <br /> TH-202 Q <br /> TH-203 Q <br /> PAW-1 S S S <br /> PAW1a** Q (then S) Q(then S) Q(then A) <br /> PAW-2 S S A <br /> PAW-8 S S A <br /> PAW-9 S S S <br /> NEW-2 S A A <br /> NEW-3 S <br /> NEW-4 S A A <br /> NE-1-10 S A A <br /> NE-6-10a* Q Q Q <br /> NE-6-10b* Q Q Q <br /> N M-20* Q Q Q <br /> NM-21* Q Q Q <br /> NM-22* Q Q Q <br /> NM-23* Q Q Q <br /> SF-2* Q Q Q <br /> NPDES Stations <br /> NE 001(mine + <br /> water pond) <br /> NE 004(Pond 4) + <br /> Ne-007 (Pond 7) + <br /> NE 008 (Pond 8) + <br /> NE 080(PRS-4) + <br /> KEY S=Semi-annually(2"d and 4th quarters) Q=Quarterly A=Annually(4th quarter) <br /> *Monitoring of the wells is suspended while the mine remains inactive, but the full monitoring program <br /> will be resumed prior to any resumption of mining. <br /> ** Monitor quarterly for one year,then frequency will change as indicated in table <br /> +see NPDES permit for frequency and required analysis <br /> Note: If the coal shipping facilities become active,the Division will be notified in writing and the <br /> frequency of monitoring reviewed and increased, if operational parameters warrant. <br /> Section 2.05 TR-73 Repaginated 12/13/2018 <br />