My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-06_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2021-01-06_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:08:27 AM
Creation date
1/6/2021 9:30:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Hydrology
Doc Date
1/6/2021
Doc Name
Hydrology Report
From
Energy Fuels Resources(USA), Inc.
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
report. The historical analytical laboratory data is provided in Appendix 5. EFRI will continue to <br /> include the Rajah Spring in future annual seeps and springs surveys. <br /> The estimated flow rate and measured field parameters are included in Appendix 1, Attachment <br /> 8 of this report, and the analytical data is summarized in Appendix 2, Table 5. <br /> Waste Rock <br /> No ore was mined and no waste rock was produced in the third quarter 2020. The Mine is <br /> currently in temporary cessation status with only maintenance and monitoring activities being <br /> conducted. EFRI has suspended the quarterly waste rock sample collection until such time that <br /> mining operations resume and waste rock removal from the Mine recommences. <br /> Production rates of ore and waste rock are summarized in Appendix 1, Attachments 9 and 10, <br /> respectively. Analytical data from previously collected waste rock samples are summarized in <br /> Appendix 2, Table 6. <br /> Sediment Pond <br /> The sediment pond has been monitored since its construction in November 2008 in accordance <br /> with the Colorado Division of Reclamation, Mining, and Safety stipulations. Although storm <br /> events and significant snow melt events have occurred, none have resulted in stormwater <br /> discharge from the pond. As a result, no stormwater samples have been collected from the pond <br /> to date. EFRI will continue to monitor the sediment pond for discharge and will collect samples <br /> in the event that a discharge is observed. <br /> Dolores River <br /> In accordance with BLM stipulations to the Mine permit, the Dolores River is required to be <br /> monitored for selenium upstream and downstream from the confluence of Lumsden Creek when <br /> all of the following conditions are met: <br /> 1) The Mine treatment plant is discharging treated water, <br /> 2) There is continuous flow from the middle tributary of Lumsden Creek to the Dolores <br /> River, and <br /> 3) Selenium levels have been in exceedance of the CDPS permit effluent limits in the past <br /> two years. <br /> Because water treatment of mine water has been suspended, it was unnecessary to monitor <br /> Lumsden Creek for discharge to the Dolores River in the third quarter 2020. EFRI will <br /> commence monitoring the Dolores River for discharge from Lumsden Creek and take samples, <br /> as necessary, at such time that treatment and discharge of mine water resumes. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.