Laserfiche WebLink
Nominal 50' to 75' x 100' Drill Pad Nominal 50' to 75' x 100' Drill Pad <br /> Constructed on 3H. 1 V Slope Constructed on 3H: IV Slope <br /> Utilizing Existing Road as Part of Pad Reclaimed Configuation <br /> Q m <br /> He He <br /> z r <br /> 0.25h:1 v 6'Deep Fee <br /> Cuttings/Fluids O Reclaimed Area <br /> Pit <br /> 102 <br /> fee <br /> Topsoil Stockpile Slope Slope fee <br /> Access Road Access Road <br /> New Construction (Reclaimed) <br /> 40 Silt Fence 40' Silt Fence <br /> During Drilling `During Drilling <br /> 20' Minimum 2.0' BERM 20' Minim= <br /> YOR <br /> 98 9- <br /> Approximate Cut Area = 2,550 SF <br /> = 94 CY Approximate Reclaimed Area = 2,550 SF = 0.06 Ac <br /> 55 <br /> Topsoil (� 1' Thick <br /> Approximate Cut = 394 CY Place brush along berm and upgradient of silt fence <br /> Cut Stored on Pad 1.6' Deep to improve sediment capture <br /> Q m <br /> A-A' Operational Surface B-B' Reclaimed Surface <br /> 120 3h:1 v Existin Surface Post—drilling Surface <br /> 120 <br /> 3h:1 <br /> W 110 0.25h:1 v W 110 <br /> � BermZZq <br /> N k / Operational Surface N <br /> Access ass Rood <br /> � 100 New Construct of n 100 <br /> U <br /> U <br /> Q 90 Q 90 <br /> 0+00 0+50 1+00 1+50 0+00 0+50 1+00 1+50 <br /> Station (ft) Station (ft) <br /> Map 25 <br /> New Elk Mine <br /> Typical Drill Pad <br /> Hillside Configuration <br /> DESIGNED BY: * DATE: 1 0/9/2020 <br /> DRAWN BY: N. Mason TR-74 <br />