Laserfiche WebLink
The Operator need not complete those portions of the permanent abandonment report which <br /> duplicate information contained on the "Well Construction and Test Report." <br /> (2)The user of the water well may assume the Operator's responsibility for maintenance of the <br /> temporary abandonment and completion of the permanent abandonment of a exploration drill hole <br /> monitoring well proposed to be converted to a water well, if the following requirements are <br /> satisfied: <br /> (a)the user of the water well must submit a copy of the completely executed well permit to the <br /> Mined Land Reclamation Office; and <br /> (b)the user of the water well and the Operator conducting the exploration must submit a <br /> completely executed "Request for Transfer of Responsibility for Abandonment of a Exploration <br /> Drill Hole Converted to a Water Well"to the Office. <br /> Page 3 <br />