My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-04_PERMIT FILE - M2017035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017035
>
2020-01-04_PERMIT FILE - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:48:34 AM
Creation date
1/5/2021 6:31:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
PERMIT FILE
Doc Date
1/4/2020
Doc Name
Application
From
Miniers Mall, LLC
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11) (Optional) Please provide additional information about the Reclamation Plan: <br /> Area affected is currently un-reclaimed and previously disturbed ground. We will fill all cuts, pits or <br /> trenches we create with larger rocks first, then a mixture of topsoil and smaller rocks, capping it with <br /> topsoil only for future re-seeding. Since this ground was un-reclaimed when we found it, we are willing <br /> to work with the BLM & DRMS to leave it better than we found it. <br /> Unnecessary and undue degradation will be minimized by utilizing erosion preventative measures such <br /> as weed-free hay bales placed on the edge of the granite cliff as needed, and around the top soil pile we <br /> created when we segregated the waste rock and other materials from the topsoil. This will assist during <br /> winterization and as an added safety issue! Straw bales will be taken apart at the end of the mining <br /> operation and used as mulch for the reseeding process. <br /> We try to do "reclamation in process"whenever and wherever possible and have already done so in a <br /> few small areas. We re-mulch and overseed all soil storage areas annually to try and improve soil <br /> conditions for final reclamation. There is no REAL topsoil on the barren ridge. Each year, more sand <br /> comes down from the cliffs above the claim. We mix organic material found while mining(IE: roots <br /> from trees that burned in the 50's, dead branches and trees, certified weed-free straw)with the "sandy <br /> soil", pre-existing mine tailings, and rich pocket earth/clay that we find within the fault. This"mixture" <br /> is better than what little actual "topsoil" is present. Please note that 75%of all areas within and outside <br /> of the claim boundary that are NOT on a slope, are crypto-biotic soils, which we take great care to <br /> protect, by always using existing routes! <br /> Reclamation-in-process will be used on along all single-track trails by seeding trail edges with native <br /> grass& bush seeds. That will allow a seed bank to form and the trail will overgrow without use. <br /> Details for reclamation per Project Area: <br /> Ridgetop Project Area: The largest vertical offset is the west edge of the area of disturbance <br /> consisting of bedrock granite protruding above an 1890s vertical shaft that was filled with <br /> debris. This vertical offset is approx. 8 foot tall. Before operations, 2 feet of this "old wall"was <br /> exposed, making the slope from west to east at a ratio of 10 feet horizontal to 3 feet vertical. <br /> There is a 20-foot-long clear area east of that to the next existing tree. We will be removing <br /> most of that"high wall"when we expand the Ridgetop AOD under the new permit. <br /> It is our intent to: <br /> 1) Fill the 120 foot deep shaft with waste rock from the waste rock storage pile. <br /> 2) Move un-enriched soil, from waste dirt pile and support area. This soil will be used <br /> to fill and grade portal below reclamation level. <br /> 3) All disturbances will be"capped"with the Topsoil Storage pile.That topsoil will be <br /> enriched as it is moved by dismantling the certified weed-free straw bales and mixing <br /> with the soil and some seeds, as it is moved. <br /> 4) The final contour of this area will mimic the original contour mention above from <br /> west to east at the same ratio, but slightly terraced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.