My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-04_PERMIT FILE - M2017035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017035
>
2020-01-04_PERMIT FILE - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:48:34 AM
Creation date
1/5/2021 6:31:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
PERMIT FILE
Doc Date
1/4/2020
Doc Name
Application
From
Miniers Mall, LLC
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D - Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> Cropland (CR) Pastureland(PL) General Agriculture (GA) <br /> Rangeland (RL) Forestry (FR) Wildlife Habitat(WL) <br /> F Residential (RS) Recreation(RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> We will fill all cuts, pits or trenches we create with larger rocks first, then a mixture of soil and smaller <br /> rocks, capping it with the stored top soil only for future re-seeding. We will reclaim and reseed all <br /> nrress routes that were used d►jring mir and prior mining aperatinns in the pact, at our rust_ <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV (example 1H:IV, 2H: IV, etc.), please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> Backfilling will use larger rocks first, then waste dirt. Final grading will utilize the topsoil we have <br /> in stnrage_ <br /> 4) r <br /> of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches �_6-8 inches <br /> 8-10 inches F�_ 10-12 inches <br /> F-1_ Other: <br /> Fv-(-J_ N/A, explain: TAp$6 l�rvm rm i�-Ap c'u tT6n-rd$-p cei' vr-te crm-c6-' Scpuruto pile. <br /> Precautions are being taken to salvage and protect ALL tnnsoil_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.