Laserfiche WebLink
EXHIBIT D - Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> Cropland (CR) Pastureland(PL) General Agriculture (GA) <br /> Rangeland (RL) Forestry (FR) Wildlife Habitat(WL) <br /> F Residential (RS) Recreation(RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> We will fill all cuts, pits or trenches we create with larger rocks first, then a mixture of soil and smaller <br /> rocks, capping it with the stored top soil only for future re-seeding. We will reclaim and reseed all <br /> nrress routes that were used d►jring mir and prior mining aperatinns in the pact, at our rust_ <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV (example 1H:IV, 2H: IV, etc.), please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> Backfilling will use larger rocks first, then waste dirt. Final grading will utilize the topsoil we have <br /> in stnrage_ <br /> 4) r <br /> of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches �_6-8 inches <br /> 8-10 inches F�_ 10-12 inches <br /> F-1_ Other: <br /> Fv-(-J_ N/A, explain: TAp$6 l�rvm rm i�-Ap c'u tT6n-rd$-p cei' vr-te crm-c6-' Scpuruto pile. <br /> Precautions are being taken to salvage and protect ALL tnnsoil_ <br />