My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-04_PERMIT FILE - M2017035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017035
>
2020-01-04_PERMIT FILE - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:48:34 AM
Creation date
1/5/2021 6:31:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
PERMIT FILE
Doc Date
1/4/2020
Doc Name
Application
From
Miniers Mall, LLC
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: Oct 2017 and completion: Oct 2027 <br /> 2) How many years is the mine anticipated to be operational: 10 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> ( /� all-yearlong or(]::]) seasonally,explain: <br /> 4) How many aces of the mine site will be disturbed at any given time: 0.50 acres <br /> 5) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches _L2_6-8 inches <br /> 8-10 inches _J�]_10-12 inches <br /> Other: <br /> r7 _N/A, explain: Current soil is a mix due to previous mining -Will be sorting all soil & rock <br /> 6) Will you need to move any overburden (check one): ( F71 )Yes or (,1)No <br /> a. If yes, approximately how thick is the overburden? 2 to 4 feet feet <br /> 7) How will the mine be accessed: (FV_1 ) existing roads (EL) new roads will be created <br /> Please describe the existing roads: <br /> Currently using existing hiking trail -The-re- are historical roads and jeep tria the area above <br /> to-more . <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> None <br /> 8) Will water be needed during the mining operation (check one): (-a)Yes or(]ZL)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (_Q)Yes or (-a)No <br /> a. If yes, please describe the water diversions or impoundments: <br /> Will be using weed-free straw bales to prevent topsoil loss around topsoil pile <br /> 10)Will any chemicals be used during the mining process (check one): (-Ll)Yes or (1a) No <br /> a. If yes, please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.