Laserfiche WebLink
DocuSign Envelope ID: EBE28081-13782-41342-13AD13-D8C9313687131B <br />ALL VALUES ARE BASED ON AVAILABLE PRELIMINARY INFORMATION <br />Client: Tri-State - Colowyo <br />Project: Elk Ridge Water Treatment Starnt@C <br />Project #: 233001407 <br />Created: DPG <br />Revision: B 3/8/2020 <br />Colowyo - Reverse Osmosis - Capital Cost Estimate <br />Category Item <br />Total Capital <br />Direct Costs <br />Mechanical Equipment <br />Treatment System <br />$1,129,608 <br />Ancillaries and Miscellaneous <br />10.0% <br />$1 13,000 <br />Subtotal Equipment <br />$1,243,000 <br />Equipment Installation and Fees <br />30% <br />$373,000 <br />Civil Preparation & Earthwork <br />8.0% <br />$99,440 <br />Structural Concrete <br />6.0% <br />$74,580 <br />Structural and Plate Steel and Walkways/Scaffolding <br />4.0% <br />$49,720 <br />Plant Power (Bulk Materials & Labor) (% Equipment Cost) <br />15% <br />$187,000 <br />Plant Electrical (Bulk Materials & Labor) (% Equipment Cost) <br />20% <br />$249,000 <br />Instrumentation (Bulk Materials & Labor) (% Equipment Cost) <br />8.0% <br />$100,000 <br />Plant Piping (Bulk Materials & Labor) (% Equipment Cost) <br />20% <br />$249,000 <br />Brine Pond <br />$4,167,958 <br />Subtotal WTP Direct Costs <br />$6,792,698 <br />Indirect Costs <br />Engineering WTP (% Total Direct Cost) <br />10% <br />$680,000 <br />Construction Management WTP (% Total Direct Cost) <br />20% <br />$525,000 <br />Freight (% EQ Cost) <br />10% <br />$124,000 <br />Commissioning <br />$80,000 <br />Construction Equipment Rental (% Installation) <br />8% <br />$30,000 <br />Contractor Small Tools and Consumables (% Installation) <br />10% <br />$38,000 <br />Startup and First Year Spare Parts (% Mechanical Equip.) <br />8% <br />$100,000 <br />Mobilization and De -Mobilization (% Installation Cost) <br />5% <br />$19,000 <br />Project Insurances (% Total Direct Costs) <br />1.25% <br />$85,000 <br />Subtotal Indirect Costs <br />$1,681,000 <br />Subtotal Base Estimate (Direct and Indirect Costs) <br />$8,474,000 <br />-50% <br />50% <br />Total Base Estimate of Project Cost (Class V) <br />$4,237,151 <br />-$12,711,000 <br />