My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-30_ENFORCEMENT - M1981118
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1981118
>
2020-12-30_ENFORCEMENT - M1981118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:05:08 AM
Creation date
1/4/2021 8:15:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981118
IBM Index Class Name
ENFORCEMENT
Doc Date
12/30/2020
Doc Name
Returned Mail
From
DRMS
To
NW Bank Minnesota Mesabi NA
Email Name
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> PERMIT INFORMATION <br /> Permit Number Operator Name Mine Name <br /> M-1981-118 Table Mountain Quarries Inc Table Mtn Quarry <br /> Type of Mine: 112c- Construction Commodity- Sandstone <br /> PRE-RECLAMATION SITE CONDITIONS <br /> The Table Mtn Quarry is located in Fremont County about 9.5 miles north of Penrose on Highway 115. The Table <br /> Mtn Quarry consists of a forfeited mine permit (M-1981-118)that is within the permit boundary of an active permit <br /> held by a separate Operator (Table Mountain Quarry, Tezak Heavy Equipment Co. Inc, M-1999-004). Because of <br /> ongoing mining related to the active permit, reclamation work for the forfeited permit was limited to two areas in <br /> the northeastern quarter of Section 22 and northwestern quarter of Section 23 of Township 17S, Range 68W <br /> related to old mining disturbances and stockpile area. A Notice of Intent to Conduct Prospect Operations permit <br /> (M-1981-118)was issued to Table Mountain Quarries, Inc. on October 19, 1981. The permit was revoked on <br /> February 25, 1993 for failure to provide annual reporting and fees and the bond money in the amount of <br /> $72,200.00 was forfeited. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Documented Quote Purchase Order <br /> (circle one) Invi a io r i _ Direct Bill <br /> PO Number: Contractor Name & Address: Construction Bond Amount (after 5% <br /> 2018 - 1090 Dates: administrative fee removed): <br /> Berry Trucking and $68,590.00 <br /> Excavating, Inc. Start: 8/17/2018 <br /> 8561 S. Ammons St. • Contract $41,950.00 <br /> Littleton, CO 80128 • Seed $3,312.90 <br /> • PM Labor$5,015.66 <br /> End: 8/6/2020 Project Cost: $50,278.56 <br /> Construction Work Description <br /> Reclamation work involved two areas east of the active permit Disturbed Area (2018) over two years (2018- <br /> 2020). In 2018, old stockpiles were spread and graded to an 3H:1V slope or less and blended with the <br /> surrounding topography. Herbicide was applied to control weed growth in both areas, and both areas (totaling 9 <br /> acres)were subsequently reseeded, fertilized, and mulched. Herbicide application in the two work areas <br /> subsequently occurred in the late summer of 2019 and again in 2020. <br /> Remaining Reclamation Requirements and Estimated Cost: The remaining areas of the old quarry permit, <br /> including highwalls, overburden and stockpiles, off-site drainage, weed control, and revegetation should be <br /> addressed by reclamation activities with the current operator. <br /> Project Manager Senior Project Manager <br /> 12/8/2020 12/9/2020 <br /> Date Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.