Laserfiche WebLink
affected lands after reclamation. Please provide a revised Figure F-1 map which shows a closer view <br /> of the affected lands. <br /> 7) Please include the following information on Figure F-1: <br /> a) The approximate final slope gradients for disturbed areas (e.g., waste rock piles, valley <br /> disturbances, mesa disturbances, Black Forest backfill area). The slope gradients should be <br /> provided in this format"3H:1 V"or"2H:1 V—3H:1 V"or"2H:1 V or flatter". <br /> b) The location of all mine openings located within the affected land boundary and a brief description <br /> of how they will be reclaimed. For example, you might add"Steve Adit—locked gate"or"Black <br /> Forest Entrance—backfilled". <br /> c) Show all structures expected to remain for reclamation. On the revised Figure F-1, the only <br /> structure shown to remain is Glencoe Valley Road. However, it is the Division's understanding <br /> that, at a minimum, the NWRP diversion structure is expected to remain for reclamation. <br /> Therefore, please ensure all structures (from the revised Figure C-1 map) which are expected to <br /> remain for reclamation are shown on this map. <br /> d) Indicate all areas within the affected land to be retopsoiled and revegetated for reclamation. This <br /> should include all areas that have already been revegetated as well as current or new disturbed <br /> areas that will require revegetation for reclamation. <br /> 8) Please provide a separate Exhibit F map(or an inset on Figure F-1)showing a closer view of the Black <br /> Forest Mine area which portrays the expected physical appearance of the backfilled mine openings. <br /> This map should depict the approximate dimensions of the backfill area, show the approximate final <br /> slope gradients, and indicate areas to be retopsoiled and revegetated for reclamation. <br /> Exhibit L—Reclamation Costs (Rule 6.4.12): <br /> 9) The Division appreciates the operator providing a copy of the site-wide bond estimate associated with <br /> the Succession of Operators(SO-1)approved in 2018(Table L-1), as well as a separate bond estimate <br /> for the reclamation proposed in AM-5 associated with backfilling the Black Forest mine openings <br /> (Table L-2). It is the Division's understanding the operator plans to submit a Surety Reduction request <br /> in the near future, at which time, reclamation costs for the entire affected lands will be re-evaluated. <br /> In its review of AM-5, the Division will focus solely on the reclamation costs associated with the <br /> proposed expansion areas, including the plan to backfill the Black Forest mine openings. <br /> Accordingly, the following additional details are required in order for the Division to calculate the <br /> reclamation costs for the proposed backfill plan: <br /> a) Please provide the expected on-site location or approximate haul/push distance for the Fill Soil. <br /> b) Please specify the type of equipment to be used to extract/load the Fill Soil, to haul this material <br /> to the Black Forest Mine (if necessary), and to place this material for reclamation. <br />