Laserfiche WebLink
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 11/19/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: 51 degrees &Sunny <br /> From: 9:00 To: 10:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Sam Lowe) 1 1.5 <br /> Billy Ray 1 1.5 <br /> Liz Busby 1 1.5 <br /> Contractor Equipment No Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger vehicle 3 4.5 <br /> . ... ................................................. .... <br /> Description of Work Performed: <br /> Ensero met with DRMA (Tim Cazier and Amy Eschberger)for final inspection. <br /> Final work looked good. The only comments were the following; <br /> -Check as-built survey to verify slope from access road down to NWRP is 2:1 <br /> -Check as-built survey to verify positive slope along flowline of berm into channel <br /> -Add more fill to back side of berm atop NWRP; especially near the channel. Reseed new fill. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Inspector: Sam Lowe Date: 11/19/2020 <br />