My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-28_GENERAL DOCUMENTS - M1977300 (23)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977300
>
2020-12-28_GENERAL DOCUMENTS - M1977300 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:32:51 AM
Creation date
12/30/2020 6:05:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
General Documents
Doc Date
12/28/2020
Doc Name Note
Part 3 of 3
Doc Name
North Waste Rock Pile Diversion
From
Colorado Legacy Land
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Legacy Land Former Schwartzwalder Mine <br /> North Waste Rock Pile Diversion Channel <br /> 6. Progress reports and photographs. <br /> 7. Warranties and guarantees. <br /> B. Transmittal of Informational Submittals: All informational submittals furnished by <br /> Subcontractors,manufacturers, and Suppliers shall be submitted to Engineer by <br /> Contractor unless otherwise specified. <br /> 1. Identify each informational submittal by Project name and number, Contract title <br /> and number, and Specification section and article number marked thereon or in <br /> letter of transmittal. Unidentifiable submittals will be returned for proper <br /> identification. <br /> 2. At the time of each submission, call to the attention of Engineer in the submittal <br /> transmittal any deviations from requirements of the Contract Documents. <br /> C. Quantity Requirements: <br /> 1. Technical reports,test reports, and administrative submittals except as otherwise <br /> specified: <br /> (a) Electronic-One copy to Engineer. <br /> 2. Written Certificates and Guarantees: <br /> (a) Paper-One copy to Engineer. <br /> (b) Electronic-One copy to Engineer. <br /> D. Engineer's Review: <br /> 1. Engineer will review informational submittals for indications of Work or Material <br /> deficiencies. <br /> 2. Engineer will respond to Contractor on those informational submittals,which <br /> indicate Work or Material deficiency. <br /> PART 2- PRODUCTS <br /> Not used. <br /> PART 3- EXECUTION <br /> Not used. <br /> — END OF SECTION— <br /> Section 013300-Submittals Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.