Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 8/4/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Sunny, 70 degrees <br /> From: 9:00 To: 11:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Sam) 1 1 Kessler Reclamation 6 6 <br /> Oversight (Billy) 1 1 <br /> Contractor Equipment No. Total Hours Subcontractor Equipment No. Total Hours <br /> Pickup Truck 1 1 Gator 11 0.5 <br /> Description of Work Performed <br /> Kessler had started installing rebar for footer of Seal wall; embedded into bedrock and epoxied. <br /> DRMS (Tim Cazier and Amy Eschberger) were on site to inspect the seal wall work prior to the concrete <br /> pour. Tim thought it was a great "field fit" and that we'd intercept 99%of the groundwater. The fractured <br /> granite will make it impossible to get a 100% seal. The DRMS gave a verbal "OK" to proceed with the <br /> concrete pour. <br /> Kessler will finish the rebar installation this afternoon. The concrete pour is planned for 8/6. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> Inspector: Sam Lowe Date: 8/4/2020 <br />