Laserfiche WebLink
PERMIT#:M-1977-300 <br /> INSPECTOR'S INITIALS: AME <br /> INSPECTION DATE: October 8,2020 <br /> fi <br /> Photo 9.View looking northeast at upper end of NWRP diversion channel where water intake <br /> structure(location indicated)is installed in ephemeral drainage above NWRP. <br /> y.. <br /> hip <br /> 7y <br /> l <br /> z � <br /> "t <br /> 40, <br /> Photo 10.Closer view of water intake structure installed at upper end of NWRP diversion channel. <br /> Note concrete seal wall(indicated with yellow arrow)installed across channel and riprap installed over <br /> granular bedding upstream of seal wall.Geoweb system will key in 1 foot deep upstream of seal wall. <br /> Page 9 of 19 <br />