Laserfiche WebLink
' COLORADO LEGACY LAND <br /> FORMER$CHWARTZWALDER MINE <br /> Species Scientific Name Season %in Mix Seed lb Ibs PLS* AC <br /> Native Grasses** <br /> Sand dro seed S orobolus cr ptandrus Warm 15 5,298,000 0.1 <br /> Sideoats grama Bouteloua curti endula Warm 15 191,000 3.1 <br /> Streambank Elymus lanceolatus spp. Cool 15 156,000 3.8 <br /> wheat grass Psammo hilus <br /> Needle and thread Hesperostipa comate spp. Cool 15 115,000 5.2 <br /> Comate <br /> Thickspike Elymus laneolatus spp. Cool 10 154,000 2.6 <br /> wheat grass Lanceolatus <br /> Blue grama Bouteloua gracilis Warm 10 825,000 0.5 <br /> Canada wildr e Elymus Canadensis Cool 10 115,000 3.5 <br /> - Native Wildflowers*** <br /> Black-eyed Susan Rudbeckia hirta Native 1.5 1,710,000 0.04 <br /> Sulfur flower Erio onum umbellatum Native 1.5 209,000 0.3 <br /> Prairie aster Maceranthera tanacetifolia Native 1.5 408,000 0.2 <br /> Purple prairie clover Dalea purpureum Native 1.5 210,000 0.3 <br /> Western yarrow Achillea millefolium var. Native 1 2,770,000 0.02 <br /> occidentalis <br /> Planic coreo sis Coreo sis tinctoria Native 1 1,400,000 0.04 <br /> Blanket flower Gaillardia aristata Native 1 132,000 0.3 <br /> Purple coneflower Echinacea purpurea Native 1 117,000 0.3 <br /> Total 100 20.3 Ibs PLS* AC <br /> Source: <br /> Technical Revision 23,Attachment B Schwartzwalder Mine Environmental Protection Plan,Table 7-2 (Whetstone <br /> Associates Inc.,2016). <br /> Notes: <br /> This upland seed mix is also included in the mitigation description portion of the USACE Section 404 Permit <br /> application and associated Biological Assessment for USFWS. <br /> *PLS/AC=Pure Live Seed per pound,per acre. If broadcast seeding,double the rate applied. <br /> **Colorado native grasses and wildflowers may be substituted with project ecologist approval only <br /> ***Wildflowers may be eliminated based on availability <br /> 2.6 DAILY OBSERVATION REPORTS <br /> Field daily observation reports filled out during construction of the NWRP Diversion Channel are presented in <br /> Appendix B. <br /> 2.7 PHOTOGRAPHS <br /> Key photographs taken during construction of the NWRP Diversion Channel project are presented <br /> chronologically in Appendix C. <br /> 3 DEVIATIONS FROM THE QA/QC PLAN <br /> The following field changes occurred during the construction of the NWRP Channel: <br /> • Alignment:When the surveyors originally staked the ditch alignment in May 2020,there were some <br /> deep cuts required to get to the channel's final grade. Additionally,the alignment was too close to the <br /> DECEMBER 2020 5 NWRP CHANNEL RECORD OF CONSTRUCTION <br />