My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-28_GENERAL DOCUMENTS - M1977300 (24)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977300
>
2020-12-28_GENERAL DOCUMENTS - M1977300 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:03:56 PM
Creation date
12/29/2020 5:04:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
General Documents
Doc Date
12/28/2020
Doc Name Note
Map: NOTES
Doc Name
North Waste Rock Pile Diversion Channel, Record of Construction
From
Colorado Legacy Land
To
DRMS
Email Name
AME
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: <br />13HE PROJECT SITE IS LOCATED IN SECTION 25, TOWNSHIP 2 SOUTH, RANGE 71 <br />WEST ON THE PARCEL OWNED BY COLORADO LEGACY LAND (OWNER). <br />23HE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM <br />AVAILABLE INFORMATION. IT SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE ALL EXISTING UTILITIES WHETHER OR NOT SHOWN ON <br />THE DRAWINGS AND TO PROTECT THEM FROM DAMAGE. WHERE A UTILITY <br />REQUIRES PROTECTION THE CONTRACTOR SHALL PROVIDE PROTECTION OF <br />THE UTILITY THAT AT LEAST MEETS THE REQUIREMENTS OF THE UTILITY <br />COMPANY. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR, <br />REPLACEMENT OR ANY OTHER CHARGES RELATED TO EXISTING UTILITIES IN <br />CONJUNCTION WITH THE EXECUTION OF THIS WORK. PRIOR TO ANY EXCAVATION <br />THE CONTRACTOR SHALL CALL COLORADO 811 WITH SUITABLE NOTICE FOR <br />THEIR LOCATING AND MARKING OF UTILITIES. <br />33HE CONTRACT DRAWINGS REPRESENT THE FINISHED WORK. CONTRACTOR <br />SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION. <br />CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, AND TOOLS <br />NECESSARY TO COMPLETELY PERFORM THE WORK IN A SAFE, EXPEDITIOUS, <br />AND WORKMAN LIKE MANNER. CONTRACTOR SHALL COORDINATE SCHEDULE OF <br />THE WORK WITH OWNER. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY <br />FOR PROPER HANDLING AND INSTALLATION OF MATERIALS. <br />4.CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO ENSURE SAFETY <br />OF ALL PERSONS AND STRUCTURES AT THE SITE AND ADJACENT TO THE SITE. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CLAIMS RESULTING FROM <br />PROJECT ACTIVITIES. VISITS TO THE SITE BY OWNER SHALL NOT RELIEVE THE <br />CONTRACTOR OF SUCH RESPONSIBILITY. <br />53HE CONTRACTOR SHALL ACCEPT FULL RESPONSIBILITY FOR MATERIALS <br />THROUGH PROJECT COMPLETION. CONTRACTOR SHALL STORE MATERIALS IN A <br />SECURE LOCATION (OR OFF-SITE). MATERIALS SHALL BE DELIVERED, STORED, <br />AND HANDLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br />63HE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER SAFEGUARDING <br />OF THE INSTALLATION AND MATERIALS STORED ON THE SITE TO PREVENT <br />THEFT, VANDALISM OR DAMAGE. <br />7.CONTRACTOR SHALL MINIMIZE DISTURBANCES TO ADJACENT AREAS THAT ARE <br />NOT WITHIN THE PROJECT WORK AREA. <br />&CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL CONSTRUCTION <br />PERMITS REQUIRED TO PERFORM THE WORK. CONTRACTOR SHALL PROVIDE <br />CERTIFICATES OF INSURANCE AND OTHER DOCUMENTATION REQUIRED BY THE <br />JURISDICTIONAL AGENCY BEFORE PERFORMING THE WORK. <br />9.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH OSHA. <br />10.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL, STATE, AND <br />FEDERAL REGULATIONS. <br />11.THESE NOTES AND OTHER DRAWING NOTES CONTAINED HEREWITH ARE <br />PROVIDED TO MEET SPECIFIC REQUIREMENTS AND TO SUPPLEMENT THE <br />CONTRACT DOCUMENTS. THESE NOTES NEITHER REPLACE NOR OVERRIDE THE <br />PROVISIONS AND REQUIREMENTS OF THE CONTRACT DOCUMENTS. <br />12.UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THE CONTRACT <br />DOCUMENTS MAY ARISE DURING CONSTRUCTION. IT IS THE RESPONSIBILITY OF <br />THE CONTRACTOR TO NOTIFY THE OWNER IF SUCH A CONDITION IS IDENTIFIED. <br />THE PRESENCE OF THE OWNER DOES NOT RELIEVE THE CONTRACTOR OF THE <br />RESPONSIBILITY FOR A PROPER INSTALLATION. <br />13.ALL DIMENSIONS, ELEVATIONS, AND CONDITIONS SHALL BE VERIFIED IN THE <br />FIELD BY THE CONTRACTOR AND ANY DISCREPANCIES SHALL BE BROUGHT TO <br />THE ATTENTION OF THE OWNER FOR CLARIFICATION BEFORE PROCEEDING WITH <br />THE AFFECTED PART OF WORK. <br />143HE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING CONDITIONS <br />BEFORE SUBMITTING BID. <br />15. IF CERTAIN FEATURES ARE NOT CLEARLY SHOWN OR CALLED OUT ON THE <br />CONTRACT DRAWINGS, CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS <br />FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR, SUBJECT TO THE <br />APPROVAL OF THE OWNER. <br />16. IN CASE OF DIFFERENCE BETWEEN DRAWINGS AND SPECIFICATIONS, THE <br />SPECIFICATIONS SHALL GOVERN. <br />17. SURVEY DATA TAKEN FROM USGS LiDAR DATA PUBLISHED 07-21-2015. <br />HORIZONTAL COORDINATES ARE SHOWN IN CO STATE PLANE COORDINATES. <br />ELEVATION DATA BASED UPON NAD 1983 VERTICAL DATUM. SURVEY UNITS ARE <br />IN US SURVEY FEET. <br />DATE ISSUE/REVISION No. DRW. APP. <br />� r r r � • <br />r r <br />A <br />ALIGNMENT DELTA ANGLE <br />D.S. <br />DOWNSTREAM <br />E <br />EASTING <br />E.F. <br />EACH FACE <br />E.G. <br />EXISTING GRADE <br />ELEV. <br />ELEVATION <br />E.W. <br />EACH WAY <br />L <br />12-13-2019 <br />For DRMS Review <br />E <br />TSC <br />-- <br />8-5-2019 <br />For DRMS Review <br />D <br />EW <br />-- <br />6-10-2019 <br />For DRMS Review <br />C <br />EW <br />-- <br />5-22-2019 <br />For DRMS Review <br />B <br />EW <br />-- <br />423-2019 <br />Draft for internal review <br />A <br />EW <br />-- <br />DATE ISSUE/REVISION No. DRW. APP. <br />� r r r � • <br />r r <br />A <br />ALIGNMENT DELTA ANGLE <br />D.S. <br />DOWNSTREAM <br />E <br />EASTING <br />E.F. <br />EACH FACE <br />E.G. <br />EXISTING GRADE <br />ELEV. <br />ELEVATION <br />E.W. <br />EACH WAY <br />L <br />LENGTH <br />N <br />NORTHING <br />NWRP <br />NORTH WASTE ROCK PILE <br />O.C. <br />ON CENTER <br />PC <br />POINT OF CURVATURE <br />PI <br />POINT OF INTERSECTION <br />PT <br />POINT OF TANGENCY <br />R <br />RADIUS <br />STA <br />STATION <br />T.O.W. <br />TOP OF WALL <br />U.S. <br />UPSTREAM <br />DISCLAIMER TEXT: <br />THIS DRAWING HAS BEEN PREPARED FOR THE USE OF ALEXCO WATER AND ENVIRONMENT INC.'S <br />CLIENT, COLORADO LEGACY LAND, LLC AND MAY NOT BE USED, REPRODUCED OR RELIED UPON BY <br />-- THIRD PARTIES, EXCEPT AS AGREED BY ALEXCO WATER AND ENVIRONMENT INC. AND COLORADO <br />COLORADO LEGACY LAND LEGACY LAND, LLC AS REQUIRED BY LAW OR FOR USE OF GOVERNMENTAL REVIEW AGENCIES. <br />ALEXCO WATER AND ENVIRONMENT INC. ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY <br />WHATSOEVER, TO ANY PARTY THAT MODIFIES THIS DRAWING WITHOUT ALEXCO WATER AND <br />ENVIRONMENT'S EXPRESS WRITTEN CONSENT <br />LEGEND <br />• -- AFFECTED AREA BOUNDARY <br />RALSTON CREEK <br />MAJOR CONTOUR (EXISTING) <br />- - -- MINOR CONTOUR (EXISTING) <br />w� x- MAJOR CONTOUR (DESIGN) <br />MINOR CONTOUR (DESIGN) <br />- - - - EDGE OF EXISTING ROADWAY <br />CHANNEL CENTERLINE <br />MATCH LINE <br />SEE SHEET 5 <br />0 <br />ENVIRONMEN <br />SECTION <br />5+00.00 <br />0 <br />GEOWEB <br />EARTHWORK <br />le <br />oftf-MA <br />CONCRETE <br />WATER SURFACE ELEVATION <br />ALIGNMENT MATCH LINE <br />CHANNEL CROSS SECTION AT STATION 11 <br />5+00" <br />SECTION CUT VIEW "A -A" <br />�V�ffivm <br />NOTES <br />NORTH WASTE ROCK PILE DIVERSION CHANNEL <br />FORMER SCHWARTZWALDER MINE, GOLDEN COLORADO <br />TECHNICAL REVISION #28 <br />MINE LAND RECLAMATION PERMIT M-1977-300 <br />REVISION: E 1 12-13-2019 1 SHEET No.: 2 <br />DESIGNED BY: SL <br />REVIEWED BY: IL <br />RECEIVED <br />DEG 2 8 00 <br />JA UIV <br />f:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.