Laserfiche WebLink
Complied! I 'Violation <br /> C( TR02 G AND SAW ,,,,, <br /> 6-3567 <br /> 87 * 9 l u' for Infractions AME/inacla <br /> 2 8 20?0 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> DMSION OF MINING AND SAF6Ty N <br /> File No.: M- 1985-184 Site Name: BIVenS Pit �, <br /> County La rl m e r TR# ORMS Use only) <br /> Permittee: Bivens Trucking & Excavating, Inc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative:Aaron B l ve n s <br /> Please provide a brief description of the proposed revision: <br /> Response to DMRS inspection on 9/2/20 (2020-09-24-INSPECTION-M1985-184) - TR to <br /> Mine Plan and Reclamation Plan/Post Mining Land Use <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(l, 2 or 3) $1006 <br />