Laserfiche WebLink
Table of contents - continued <br />• Table No. <br />Pane <br />4.8-10 <br />Operational ground water quality monitoring <br />4-228 <br />4.8-10a <br />Operational ground water quality, August 1980-86 <br />4-233ff <br />4.8-11 <br />Operational surface water monitoring schedule <br />4-240 <br />4.8-12 <br />List of surface water quality parameters to be monitored <br />4-241 <br />4.8-13 <br />List of ground water quality parameters to be <br />4-243 <br />monitored <br />4.8-13a <br />Operational ground water monitoring schedule <br />4-244 <br />4.8-14 <br />Postmine infiltration rates on reclaimed sites <br />4-247c <br />in Ashmore, Derringer, and Enfield pits in <br />1983-86 <br />4.9-1 <br />Reserved <br />4.9-2 <br />Reserved <br />4.9-3 <br />Bank cubic yards (BCI) of topsoil to be salvaged <br />4-261 <br />and replaced by pit from 1998-2002, and the <br />resultant drawdown or increase of stockpile <br />• <br />inventory <br />4.9-4 <br />Total topsoil needed in BCrs at year end by pit <br />4-262 <br />versus total topsoil stockpile inventory <br />• 6/9' iii -17 MAY 13 1998 <br />