My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-16_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2020-12-16_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 5:57:30 AM
Creation date
12/23/2020 9:15:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
12/16/2020
Doc Name
Approval Document
From
American Gypsum Company LLC
To
AM04
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#02 Page 2 of 2 <br /> Operator Skill: 0.750 AVG.) <br /> Material consistency: 1.100 CAT HB <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 0.422 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.438 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3740 <br /> Adjusted unit 494.95 LCY/hr <br /> production: <br /> Adjusted fleet 989.9 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.542/LCY <br /> Total job time: 1,114.59 Hours <br /> Total job cost: $598,440 <br />
The URL can be used to link to this page
Your browser does not support the video tag.