My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-30_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-06-30_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:37:14 AM
Creation date
12/21/2020 11:30:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/30/2020
Doc Name Note
FOR MT8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Midterm Review Items <br />The Division reviewed another item that has no specific requirement in the Regulations <br />requiring their review. Regarding the timing of backfilling and grading (Rule 4.14.1), TMI has <br />been granted a variance from the requirement that this operation be performed within 180 days <br />after coal removal. This variance was granted in the approval of a permit revision in 1988 <br />(PR-02). <br />Regarding the D/E Pit, which has been temporarily abandoned and left open for an extended <br />period of time, a plan to use this pit for utility waste disposal (ash from the Craig Power Plant) <br />has been approved (as discussed in PR-02). TMI is proposing a revision to the post mine <br />topography of the D/E pit with PR9 based on projected future reductions of coal ash placement <br />as a result of known and probable future Craig Station unit closures. At the writing of this <br />document, PR9 is currently under review by DRMS. <br />Bond <br />DRMS is currently reviewing PR9 which updates the projected liability amount for the permit <br />term. The PR9 cost estimate will update the site -wide estimate for the reclamation liability at <br />the site based on the revised operation and reclamation plan. DRMS projects issuing a <br />decision on PR9 on June 30, 2020, however this is subject to change. With the approval and <br />issuance of TR124 on May 19, 2020, DRMS increased TMI's liability for the Trapper Mine by <br />$8,106,155.00. Also, with the approval of SL20 on May 20, 2020, DRMS evaluated the <br />reclamation liability at the site and found the current required surety of $29,491,874.54 to be <br />sufficient to complete reclamation of the affected land. The Division currently holds a <br />corporate surety of $30,500,000.00 for the Trapper Mine. <br />SECTION III - REQUESTED REVISIONS OF PERMIT APPLICATION and <br />MIDTERM ADEQUACY QUESTIONS <br />As a result of this midterm review, for the purpose of fulfilling the requirements of the <br />Colorado Surface Coal Mining Reclamation Act, and the Regulations of the Colorado Mined <br />Land Reclamation Board for Coal Mining, pursuant to Rule 2.08.3, the Division finds that the <br />permit application C-1981-010 contains the below bulleted deficiencies. The Division requests <br />that the permittee correct the deficiencies by submission of revised permit pages under <br />appropriate revision applications, by September 30, 2020. <br />The Division recognizes that sections of the permit are currently being revised by PR9. <br />2.03.4 Identification of Interest <br />• If PR9 is not issued, TMI will need to update the applicable information in Section 1 of <br />the permit binder. <br />2.04.7 Hydrology Description <br />MT8_Trapper Midterm 2020 Findings JLE (1) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.