My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-30_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-06-30_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:37:14 AM
Creation date
12/21/2020 11:30:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/30/2020
Doc Name Note
FOR MT8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I - INTRODUCTION <br />Purpose of this Document <br />This document presents the results of the Midterm Permit Review number 8 (MT8) of the <br />Trapper Mining, Inc. (TMI) Trapper Mine. The Colorado Division of Reclamation, Mining <br />and Safety (Division) conducted this review for the purpose of fulfilling the requirements of <br />the Colorado Surface Coal Mining Reclamation Act (Act), and the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining (Regulations). <br />Organization of this Document <br />This document is divided into the following three parts: <br />Part I - Introduction <br />Part II— Summary of Operations, Revisions to Permit, <br />Violations, Stipulations, Variances, and Bond <br />Part III — Requested Revisions of Permit Application <br />Midterm Review Requirements of the Regulations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each <br />mining and reclamation permit prior to the middle of the permit's term (2 '/z years). Based on <br />this Midterm Review, for good cause shown, the Division may require the permittee to revise <br />or modify the permit in order to ensure compliance with the Act and Regulations. <br />Table I lists the other Sections of the Regulations that require a Midterm Review of specific <br />aspects of each permit. <br />MT8_Trapper Midterm 2020 Findings JLE (1) Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.