My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-30_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-06-30_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:37:14 AM
Creation date
12/21/2020 11:14:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/30/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revisions to Permit <br />Revisions made to the permit since the last permit renewal (RN-07, issued on January 9, 2018) <br />are listed below. <br />Bond Releases <br />SL18, Phase I bond release for 175.3 acres. Reduced liability by $858,015.48. Issued on <br />August 27, 2019. <br />SL19, Phase II bond release for 376.1 acres. Reduced liability by $767,029.62. Issued on <br />December 6, 2019. <br />SL20, Phase III bond release for 162.10 acres. Increased liability by $162,813.81 (see SL20 <br />findings document for details). Approved on May 20, 2020. The final decision is pending the <br />close of the public comment period. <br />Permit Revisions <br />PR8, provided a response to the stipulations put on the permit with the approval of Permit <br />Revision number 7 (PR7). Increased the affected land by 25 acres and the required liability by <br />$108,759.19. <br />PR9 is currently under review by DRMS at the writing of this document. The Permit Revision <br />updates the operations and reclamation plan for the remainder of the permit term. <br />Technical Revisions <br />TR119, revised the 2018 mine and reclamation plan, specifically the 2018 soil stripping <br />location. This revision increased the affected area by 245 acres and the required liability by <br />$880,549.88. Issued June 26, 2018. <br />TR120, was the 2017 annual reclamation report. Issued September 11, 2018. <br />TR121, revised the coal stockpile located in Johnson and Pyeatt drainages. This increased the <br />affected land by 6.5 acres and the required liability by $33,351.10. Issued September 18, 2018. <br />TR122, was the 2018 annual reclamation report. Issued July 26, 2019. <br />TR123, update of the 2019 mining and reclamation plan. Issued August 20, 2019. <br />TR124, revised the mining plan to mine in the N-Pit and revised portions of the reclamation <br />plan. This revision increased the approved affected land by 201.40 acres and the required <br />liability by $8,106,155.00. Issued on May 19, 2020. <br />TR125, was the 2019 annual reclamation report. Issued on May 19, 2020. <br />Minor Revisions — <br />MR224, revised section 4.3.4 of the permit application package addressing the placement of <br />utility waste. Issued on April 25, 2019. <br />Violations <br />No violations were issued since the last permit renewal application was approved. <br />MT8_Trapper Midterm 2020 Findings JLE (1) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.