Laserfiche WebLink
inspection the Division collected data for use in validating the on the ground topography of the bond <br /> release parcels. <br /> MiddleEast <br /> IeFluinel <br /> Ake <br /> Middle Flume 3 <br /> Map 1: Areas associated with Phase I(SL21)bond release. The light orange areas indicate the locations of the SL21 <br /> As demonstrated by the map review, and the data collected and illustrated below, the difference in <br /> field collected elevation appears generally consistent throughout the site and corroborates TMI's <br /> approved post mining topography as per Map M12. <br /> Using Microsoft Excel® (Table V), the Division charted the PMT from the ARR (M 1) map <br /> elevations, and the on the ground measured elevations. The illustrations below show transect <br /> locations, and field collected points in relationship to the 2019 ARR Map and transect cross sections <br /> exhibiting the elevation differences between the TMI map and field collected information. <br /> Permit Number <br /> C1981010 <br /> Prepared by: R.Reilley,MS,GISP <br /> SL21 <br /> Page 10 of 15 <br />