My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-09_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2020-12-09_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:41:25 PM
Creation date
12/16/2020 4:27:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
12/9/2020
Doc Name Note
For (SL8)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Moffat County Mining, LLC
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
features for the Yoast Mine were approved under Technical Revision No's. 37 and 49 (TR37 and <br /> TR49) on 4 December 2008 and 16 September 2010, respectively. Access roads include road(s) A <br /> and B (road B becomes road LU-3A). Light use roads include LU1, LU2, LU3A, LU4, and LU5. The <br /> roads approved for permanent retention were deemed necessary to support the post-mining land use <br /> and are utilized by property owners for access. <br /> The Division approved permanent pond demonstrations for three of the five remaining sediment <br /> ponds. Sediment ponds 10, 13, and 14 as well as two small livestock/wildlife stock tanks; Stock Tanks <br /> 1 and I IA have received approval from the Division to remain as permanent features. Ponds 12, 12A, <br /> 13 and 14 receive runoff from the SL8 bond release area. Permanent ponds have met the criteria <br /> specified under Rule 4.05.9(13) and were deemed necessary to support the post-mining land use. <br /> Ponds 10, and stock tank 1 achieved phase I release in SL4 and constitute approximately 0.7 and 0.2 <br /> acres respectively that will not be backfilled and graded. Stock Tankl IA(0.2 acres), and its associated <br /> drainage and Ponds 13 and 14 comprised the SL6 partial Phase I bond release and constitute 0.7 acres <br /> each, for a total of 1.6 acres which will not undergo backfilling and grading. Both ponds 13 and 14 <br /> received phase I bond release in the SL6 permitting action. Pond 14 has been permitted as a permanent <br /> impoundment in its current configuration as has Stock Tank I IA. <br /> The Pond 10 watershed has previously been released. The Pond 12 watershed area includes a portion of <br /> the South Pit and the Neck Pit mining areas. These areas were to be graded to approximate original <br /> contour,as depicted in the approved Exhibit 20-2 of the Permit Application Package (PAP),their <br /> drainages reestablished, and the areas were to be topsoiled and reseeded. <br /> The Pond 12 watershed area was originally part of the SL4 bond release request;however, during the <br /> adequacy review of the SL4 bond release application,the Division determined that this area was not <br /> eligible for Phase I bond release. In early July 2012, a major rainfall event occurred in the Yoast Mine <br /> area,resulting in widespread damage to the south mine post-mining drainage channels. The YPM-5-1, <br /> YPM-6-2,YPM-6-3 YPM-7, and YPM-7A, drainages and watersheds, all draining to the Pond 12 <br /> watershed,required reconstruction and were excluded from the SL4 bond release. <br /> The Pond 12 watershed area also included the north inslope of Pond 12, including the Pond 012 slide <br /> area. Major landslides have occurred in the Pond 12 slide area on four separate occasions dating back to <br /> 2006, and minor slumps and sloughing had been ongoing through 2011. In 2011, SPL completed the <br /> regrading and drainage installation portion of the approved slide remediation plan (Technical Revision <br /> No. 46). The Pond 12A and Pond 14 watersheds were phase II and phase III released with SL7. <br /> For the Pond 13 Slide Area no reclamation is required, as it has been permitted as a permanent <br /> impoundment in its current configuration. Pond 13 was not previously considered for Phase I bond <br /> release as it was within the Pond 13 slide area parcel that was required to be observed for at least one year <br /> following the 2012 slide activities prior to being eligible for bond release. The Pond was ultimately <br /> released in the SL6 partial phase I permitting action. <br /> The following Ponds were requested for phase II release in the SL8 application: <br /> Pond 10 Pond I IA Pond 12 Pond 12A <br /> Pond 13 Pond 14 Stock Tank 1 <br /> Permit Number C1994 082 Page 4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.