My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-15_PERMIT FILE - M2020065 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020065
>
2020-12-15_PERMIT FILE - M2020065 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:17:00 AM
Creation date
12/16/2020 11:32:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020065
IBM Index Class Name
Permit File
Doc Date
12/15/2020
Doc Name
Application
From
Colorado Gators, Inc.
To
DRMS
Email Name
SJM
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT G WATER INFORMATION <br /> This exhibit discusses the water quality monitoring plan developed to protect the integrity of <br /> local surface and groundwater quality. The permittee is committed to protecting the prevailing <br /> hydrological balance and water quality at the site. <br /> 1. General <br /> There are no natural waterways within the Mystic Soil affected area. Groundwater is at least 80 <br /> inches below the natural grade. Lateral Forty-seven of the Farmers Union Canal borders the <br /> north side of the permit area. <br /> 2. Water Quality Protection <br /> The main concerns regarding water quality are potential impacts to Lateral Forty-seven of the <br /> Farmers Union Canal and the groundwater aquifer from sediment,hydraulic fluids, or diesel fuel. <br /> Sediment will be controlled through the use of stormwater retention within the disturbance area <br /> throughout the life of the mine. All stormwater runoff and surface water flows from the local <br /> drainage area will be collected with control measures built around the site. This includes mine <br /> slopes and the stormwater berms. This will contain all sediment within the site and prevent its <br /> unattended discharge from the site. Hydraulic fluids and diesel fuels will be contained within any <br /> vehicles through the use of best practices of maintenance and regular inspections of vehicles, <br /> hydraulic lines, and any other potential sources of spills. Diesel is proposed to be stored on-site <br /> in one 500 gallon double walled tank,the additional wall acting as the required secondary <br /> containment. Inadvertent spills that occur during fueling or refilling operations will be cleaned <br /> up immediately utilizing spill kits located adjacent to all fueling areas. A set back of 500 feet <br /> from Lateral Forty-seven of the Farmers Union Canal will be maintained to prevent contaminates <br /> from entering it. <br /> 3. Floodplain <br /> No 100-YR FEMA3 floodplain encompasses the mining area. <br /> 3 Federal Emergency Management Agency <br /> Mystic Soil <br /> November 2020 G-2 c. �Awerk.and lssadalCs Yt.i.i <br />
The URL can be used to link to this page
Your browser does not support the video tag.