Laserfiche WebLink
- Active pit serving as a stormwater settling pond <br /> - Portable lights with a generator for emergency after hours maintenance support <br /> The following list is the best estimate of equipment that will be used onsite throughout the <br /> mine life: <br /> - 1-2 Front end loaders <br /> - 1-2 D-10 Bulldozer <br /> - 14000 gallon water truck <br /> - Off-highway road haul trucks (number will depend upon production needs) <br /> - 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br /> A portable asphalt plant may be erected on the site periodically. Material crushed and <br /> stockpiled on site may be used for asphalt production. Asphalt production may occur only <br /> during the warm season months of April through October. Components associated with the <br /> portable asphalt plant include: <br /> - Liquid asphalt storage <br /> - Aggregate feed bins <br /> - Mixer <br /> - Conveyors <br /> - Lime silo <br /> - Truck loading equipment <br /> - Power supply and distribution <br /> All fuel tanks will have secondary containment. Some are double walled; others will be <br /> located within bermed or lined areas that have over 110% of the volume of the largest stored <br /> tank. Fuel tanks may be in the processing area. <br />