Laserfiche WebLink
Exhibit M - OTHER PERMIT AND LICENSES <br /> 1. An Air Pollution permit will be obtained for the mine operation if needed. Less than 70,000 tons <br /> per year is mined or processed at the site,one may not be needed.The eamtFaeteF that dees the <br /> �wh <br /> mment[]Wl]:Leftover from Fox Pit where <br /> ave the sandstne crushed. Deleted it since no2 Use cessing occurs at Native. <br /> seme of the-+}ew pa Fts-ef44e.-q4n­e,­The existing area and thea-P additional 25.3 acres±is covered by a <br /> City of Pueblo Eewnty Exemption dated 114/15-7/77. Attached is a-copy of the Exemption information <br /> received from the Citv. <br /> 3. This is an open pit operation where ground water will not be exposed. A substitute water <br /> supply plan(SWSP)is not needed.Stormwater that accumulates after a storm event is release within 72 <br /> hours of the end of the storm. <br /> 4. A dredge fill permit(404)is not required at this time because waters of the U.S.will not be <br /> impacted. If it is determined a 404 permit is needed to mine parts of the site it will be obtained prior to <br /> mining commencing in those areas. <br /> 5. CDPHE Permit#COG-501802(formerly COR-341032),from the COLORADO DEPARTMENT OF <br /> HEALTH AND ENVIRONMENT-WATER QUALITY CONTROL DIVISION,is in place to cover any stormwater <br /> discharges. The corresponding Stormwater Management Plan(SWMP)is also in place. Both will need <br /> amended/updated to cover the new area. <br /> Summit Brick&Tile Company - Native/Pierre Mine 126/10 2020 <br />