Laserfiche WebLink
b) Evaluation of compliance with the performance standards (30 CFR Parts 800 through <br />823): <br />Performance standards at 30 CFR 817.41(c)(1) and (d)(1) state that surface and groundwater <br />monitoring data, respectively, shall be submitted no less than every three months to the <br />regulatory authority. GCCE's PAP meets the requirements of these rules, but they are <br />advised that Seep 3 needs to be monitored on the frequency specified in the PAP. <br />(3) On the basis of the preceding evaluation, I conclude that: <br />N This part of the application/document complies with the requirements of the applicable <br />regulations. <br />❑ This part of the application/document does not comply with the requirements of the <br />applicable regulations. The aforementioned issues that do not satisfy the conditions of the <br />Federal regulations are in bold. <br />❑ The above evaluation may concern a proposed revision of the reclamation plan that affects <br />reclamation costs. Mine team leader/mine permit coordinator, please make the team bond cost <br />estimator aware of this revision so that he or she can determine whether the bond amount needs <br />to be adjusted. <br />6. PRIMARY AND PEER REVIEWERS. <br />A. Primary reviewer: <br />i <br />Flynn Dickinson, Hydrologist <br />B. Peer reviewer: <br />Paul Clark, Hydrologist <br />11/27/2020 <br />Date <br />//- 3D - 2-D Z-0 <br />Date <br />