Laserfiche WebLink
Material Keys <br /> 1:Overburden <br /> 2:Sand and Gravel <br /> 300 — — <br /> 3 Weathered Bedrock <br /> 4:Stable Bedrock <br /> 280 — — <br /> 0042 5:Slurry Wall <br /> 260 — — <br /> 240 — — <br /> 75 ft Offset to Crity Road <br /> CU <br /> 220 m0 <br /> C: <br /> -E <br /> 200 — <br /> ............ <br /> 180 — — — — — — — — — — — — — — <br /> ------------------- <br /> 160 — — <br /> 140 — — <br /> 120 — — <br /> 100 — — Analysis 1 <br /> Multiple Stability Analysis <br /> 80 — — Method: Bishop Simplified <br /> Surface: Circular <br /> 60 Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 1.77 <br /> GALENA Version 7.2 Licensed to:J&T Consulting <br /> Edited: 4 Dec 2020 <br /> Project West Farm Pit Expansion Processed: 4 Dec 2020 <br /> Case 8-3 Rapid Drawdown-Pseuclostatic q= J&T Consuftln&Inc. <br /> File:CAGalena Models\Case 8-3\VVest Farm Expansion Case 8-3 Rapid Drawdown-EQ.gmf IIIA I <br />