Laserfiche WebLink
Material Keys <br /> 1 Overburden <br /> 2:Sand and Gravel <br /> 3:Weathered Bedrock <br /> 300 <br /> 4:Stable Bedrock <br /> ♦0 0422 5:Slurry Wall <br /> 250 <br /> 145 ft Offset to Elec/Gas <br /> m j N <br /> J > (6 <br /> C 0 <br /> C_ j N <br /> 200 — - - - - - - - - - - - - - — — — — — — — - - � <br /> 150 <br /> 100 <br /> Analysis 1 <br /> Multiple Stability Analysis <br /> Method: Bishop Simplified <br /> Surface: Circular <br /> 50 <br /> Results <br /> 100 150 200 250 300 350 400 450 500 Critical Factor of Safety: 3.55 <br /> GALENA version 7.2 Licensed to:J&T Consulting <br /> Edited. 4 Dec 2020 <br /> Project West Farm Pit Expansion Processed: 4 Dec2020 <br /> Case 8-1 Full Reservoir-Pseudostatic <br /> 1aT Cansntting.Inc, <br /> File:C:\Galena Models\Case 8-1\West Farm Expansion Case 8-1 Full Reservoir-EQ.gmf V <br />