Laserfiche WebLink
Material Keys <br /> 1:Overburden <br /> 2:Sand and Gravel <br /> 300 <br /> 3:Weathered Bedrock <br /> 4:Stable Bedrock <br /> 280 <br /> 5:Slurry Wall <br /> 260 <br /> 240 <br /> 75 ft Offset to Cnty Road <br /> CU <br /> 220 <br /> � U U <br /> 200 — — — <br /> . .—.—.—.—.—.. <br /> 180 — — — — — — — — — — — — <br /> ------------------- <br /> 160 <br /> 140 <br /> 120 <br /> 100 Analysis 1 <br /> Multiple Stability Analysis <br /> 80 Method: Bishop Simplified <br /> Surface: Circular <br /> 60 <br /> Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 2.21 <br /> GALENA version 7.2 Licensed to:J&T Consulting <br /> Edited: 2 Dec 2020 <br /> Proiect West Farm Pit Expansion Processed: 2 Dec2020 <br /> Case 8-3 Rapid Drawdown JsTConsnN[ng Inc. <br /> File:C:\Galena Models\West Farm Expansion Case 8-3 Rapid Drawdown.gmf V <br />