My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-08_REVISION - M2008078 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2020-12-08_REVISION - M2008078 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 5:45:39 AM
Creation date
12/14/2020 7:09:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
REVISION
Doc Date
12/8/2020
Doc Name Note
Part 3 of 6
Doc Name
Request For Amendment To Permit
From
Prowers Aggregate Operators, LLC
To
DRMS
Type & Sequence
AM2
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case 4-1 — Electric Line/Poles to the East of Phase 4. <br /> The proposed setback for mining is 75 feet from the lines/poles. The mining <br /> depth was assumed to be 43 feet in this area based on bore log information in <br /> the geotechnical investigations. <br /> Case 4-2 — Ditch Bank to the South of Phase 4. <br /> The proposed setback for mining is 85 feet from the edge of the ditch bank. The <br /> mining depth was assumed to be 54 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 5-1 — Edge of Conservation Easement to the East of Phase 5. <br /> The proposed setback for mining is 55 feet from the edge of the easement. The <br /> mining depth was assumed to be 39 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 5-2 — Canal Bank to the South of Phase 5. <br /> The proposed setback for mining is 75 feet from the edge of the canal bank. The <br /> mining depth was assumed to be 17 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 6-1 — Edge of Conservation Easement to the East of Phase 6. <br /> The proposed setback for mining is 50 feet from the edge of the easement. The <br /> mining depth was assumed to be 41 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 6-2 — Canal Bank to the South of Phase 6. <br /> The proposed setback for mining is 75 feet from the edge of the canal bank. The <br /> mining depth was assumed to be 25 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 7-1 — Electric/Gas Lines to the North of Phase 7. <br /> The proposed setback for mining is 150 feet from the electric/gas lines. The <br /> mining depth was assumed to be 56 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 7-2 — Canal Bank to the South of Phase 7. <br /> The proposed setback for mining is 80 feet from the edge of the canal bank. The <br /> mining depth was assumed to be 56 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> Case 8-1 — Electric/Gas Lines to the North of Phase 8. <br /> The proposed setback for mining is 145 feet from the electric/gas lines. The <br /> mining depth was assumed to be 37 feet in this area based on bore log <br /> information in the geotechnical investigations. <br /> West Farm Gravel Pit Expansion <br /> Slope Stability Analysis <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.