My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-08_REVISION - M2008078 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2020-12-08_REVISION - M2008078 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 5:36:59 AM
Creation date
12/14/2020 7:04:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
REVISION
Doc Date
12/8/2020
Doc Name Note
Part 1 of 6
Doc Name
Request For Amendment To Permit
From
Prowers Aggregate Operators, LLC
To
DRMS
Type & Sequence
AM2
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All local, State, and Federal rules and regulations will be followed for the storage and handling <br /> of any fuel for the facilities. <br /> Mine Phasing <br /> Prowers Aggregate Operators, LLC anticipates mining and reclaiming the West Farm Pit site in <br /> 9 phases, progressing through the phases as shown on the Mining Plan Map. The overall time <br /> required to complete the mining and reclamation is estimated to be approximately 30 years. <br /> Production is expected to be 2,000,000 tons per year with a possible maximum production rate <br /> of 2,500,000 tons per year. However, it is possible that due to demand fluctuations, mining <br /> could progress slower than anticipated and additional time may be required for mining and <br /> reclamation of the site. <br /> The mining and reclamation of Phases 1 is complete. Phase 2 is approximately 60%-70% <br /> complete. Using a production rate of 2,000,000 tons per year Phases 2-9 are estimated to be <br /> mined according to the following sequence and timeline: <br /> Phase Estimated Time Estimated Total <br /> Sequence Required to Mine Mining Time <br /> Phases (years) <br /> ears <br /> 1 MiningCom fete 0 years <br /> 2 1 years 1 years <br /> 3 5 years 6 years <br /> 4 9.5 years 15.5 years <br /> 5 2.5 ears 18 ears <br /> 6 4.5 ears 22.5 ears <br /> 7 3.75, ears 26.25 years <br /> 8 0.75, ears 27 years <br /> 9 2.75 years 29.75 years <br /> -' JaT Consulting,Inc. Prowers Aggregate Operators, LLC. <br /> West Farm Pit—M-2008-078 <br /> DRMS 112 Permit Amendment Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.