Laserfiche WebLink
All local, State, and Federal rules and regulations will be followed for the storage and handling <br /> of any fuel for the facilities. <br /> Mine Phasing <br /> Prowers Aggregate Operators, LLC anticipates mining and reclaiming the West Farm Pit site in <br /> 9 phases, progressing through the phases as shown on the Mining Plan Map. The overall time <br /> required to complete the mining and reclamation is estimated to be approximately 30 years. <br /> Production is expected to be 2,000,000 tons per year with a possible maximum production rate <br /> of 2,500,000 tons per year. However, it is possible that due to demand fluctuations, mining <br /> could progress slower than anticipated and additional time may be required for mining and <br /> reclamation of the site. <br /> The mining and reclamation of Phases 1 is complete. Phase 2 is approximately 60%-70% <br /> complete. Using a production rate of 2,000,000 tons per year Phases 2-9 are estimated to be <br /> mined according to the following sequence and timeline: <br /> Phase Estimated Time Estimated Total <br /> Sequence Required to Mine Mining Time <br /> Phases (years) <br /> ears <br /> 1 MiningCom fete 0 years <br /> 2 1 years 1 years <br /> 3 5 years 6 years <br /> 4 9.5 years 15.5 years <br /> 5 2.5 ears 18 ears <br /> 6 4.5 ears 22.5 ears <br /> 7 3.75, ears 26.25 years <br /> 8 0.75, ears 27 years <br /> 9 2.75 years 29.75 years <br /> -' JaT Consulting,Inc. Prowers Aggregate Operators, LLC. <br /> West Farm Pit—M-2008-078 <br /> DRMS 112 Permit Amendment Application <br />