My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-11_REVISION - C1981010 (22)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-12-11_REVISION - C1981010 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:41:16 PM
Creation date
12/11/2020 11:55:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/11/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
SL21
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division's satisfaction. <br /> +f -dr l <br /> Ot <br /> 77 <br /> • <br /> Map I: Areas associated with Phase I(SL21)bond release. The light orange areas indicate <br /> the locations of the SL21 parcels. <br /> III. APPROVAL CRITERIA for BOND RELEASE <br /> Phase I Bond Release <br /> Under Colorado's Permanent Program, the process of releasing the reclamation bond for a mine site is <br /> explained in Rule 3.03 and further described in the Division's 1995 Guideline Regarding Selected Coal <br /> Mining Bond Release Issues. For Phase I bond release,Rule 3.03.1(2)(a)states: <br /> "Up to sixty percent of the applicable bond amount shall be released when the permittee <br /> successfully completes backfilling, regrading, and drainage control in accordance with the <br /> approved reclamation plan." <br /> Trapper Mine accomplishes backfilling of the mined pits primarily with draglines, using <br /> overburden and inter burden material from a cut to backfill a previous, adjacent cut. Other <br /> equipment such as bulldozers, scrapers, backhoes, front end loaders and trucks are also used to <br /> backfill areas. Once backfilled, bulldozers and/or graders grade the area to achieve approximate <br /> original contour. The approved reclamation plan for the Trapper Mine calls for backfilling and <br /> grading mine excavations and shaping the backfilled areas to the approximate configurations <br /> shown on the Postmining Topography Map, Map M12 in the permit. Graded areas are to blend <br /> Permit Number <br /> C1981010 <br /> Prepared by: R.Reilley,MS,GISP <br /> SL21 <br /> Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.