Laserfiche WebLink
<br /> <br /> <br /> <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 www.colorado.gov/water <br />Jared S. Polis, Governor | Dan Gibbs, Executive Director | Kevin G. Rein, State Engineer/Director <br />Response to Reclamation Permit Application Consideration <br /> <br />DATE: December 7, 2020 <br /> <br />TO: Timothy A Cazier, Environmental Protection Specialist <br /> <br />CC: Division 2 Office; District 12 Water Commissioner <br /> <br />FROM: Kate Fuller, PE <br /> <br />RE: South 40 Quarry No. 2, File No. M-2020-051 <br /> Operator: High Plains Stone Company <br /> Contact: Debbie Wagner, (303) 791-1862 <br /> Sec. 14, Twp. 17S, Rng. 68W, 6th P.M., Fremont County <br /> <br />CONDITIONS FOR APPROVAL <br /> <br /> The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br /> <br /> If storm water is contained on-site, the applicant should be aware that, unless the storm <br />water detention structures can meet the requirements of a “storm water detention and <br />infiltration facility” as defined in section 37 -92-602(8), Colorado Revised Statutes, the <br />structure may be subject to administration by this office. The applicant should review DWR’s <br />Administrative Statement Regarding the Management of Storm Water Detention Facilities <br />and Post-Wildland Fire Facilities in Colorado (available at: <br />https://dnrweblink.state.co.us/dwr/0/edoc/3576581/DWR_3576581.pdf?searchid=978a5a3 <br />1-ddf9-4e09-b58c-a96f372c943d) to ensure that the notification, construction and operation <br />of the proposed structure meets statutory and administrative requirements. The applicant is <br />encouraged to use Colorado Stormwater Detention and Infiltration Facility Notification <br />Portal, located online at: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, <br />to meet the notification requirements. <br /> <br /> Other: All water used on-site shall be a legal supply of water provided by an appropriate <br />supplier. The applicant shall confirm the legality of any proposed source of water supply <br />with the Division of Water Resources prior to use in the operation. <br /> <br /> <br /> <br />COMMENTS: The local Water Commissioner, Dan Henrichs, may be contacted at (719) 269-2800 or <br />Dan.Henrichs@state.co.us regarding legal water supplies in the area. <br />